MCQOPTIONS
Bookmark
Saved Bookmarks
→
Highway Engineering
→
Embankment Subgrade in Highway Engineering
→
The soaking period in CBR sample is _____________..
1.
The soaking period in CBR sample is _____________
A.
2 days
B.
3 days
C.
4 days
D.
5 days
Answer» D. 5 days
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The design factor not considered in CBR is _____________
The critical stress is considered in _____________
What is the maximum aggregate size in CBR method?
The top 500mm of soil sub grade should be compacted at _____________
As per MORTH the specified compaction of density is _____________
What is the total thickness of the pavement?
The soaking period in CBR sample is _____________
The CBR method was developed by _____________
The design charts are prepared based on _____________
CBR is a _____________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply