MCQOPTIONS
Saved Bookmarks
1. |
The reduction in project time normally results in_______________? |
A. | decreasing the direct cost and increasing indirect cost |
B. | increasing the direct cost and decreasing the indirect cost |
C. | increasing the direct cost and indirect cost both |
D. | decreasing the direct cost and indirect cost both |
Answer» C. increasing the direct cost and indirect cost both | |