The master plan may not be prepared for __________...
1.
The master plan may not be prepared for ______________
A.
Village
B.
City
C.
State
D.
Country
Answer» B. City
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The utility unit as per saturation system for a population of less 1001 to 2000 is?
The final step after fixing the optimum length of the road is?
The determination of optimum length is based on ______________
The master plan may not be prepared for ______________
The accident cost analysis is estimated by conducting ______________
Planning is based on _______________