

MCQOPTIONS
Saved Bookmarks
1. |
*/*_Select the incorrect statement? |
A. | The loss of prestress is more in pre-tensioning system than in post-tensioning system. |
B. | Pretensioning system has greater certainty about its durability. |
C. | For heavy loads and large spans in buildings or bridges, post-tensioning system is cheaper than pretensioning system |
D. | none of the above |
Answer» E. | |