1.

Pick up the correct statement from the following

A. In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal
B. In a level crossing a regulator is provided across the drainage at its down-stream
C. In a level crossing, a cross regulator is provided on the canal below the crossing
D. All the above
Answer» E.


Discussion

No Comment Found