Pick up the correct statement from the following |
| A. | In a level crossing, a crest with its top at the canal F.S.L. is provided across the drainage at its up-stream junction with canal |
| B. | In a level crossing a regulator is provided across the drainage at its down-stream |
| C. | In a level crossing, a cross regulator is provided on the canal below the crossing |
| D. | All the above |
| Answer» E. | |