Pick up the correct statement from the following:$? |
A. | The difference of latest occurrence time and earliest expected time, is called slack |
B. | The activities connecting the events having zero slack, lie on the critical path |
C. | The critical path consumes the maximum time |
D. | All the above |
Answer» E. | |