

MCQOPTIONS
Saved Bookmarks
1. |
Indian Railways completed the Arch closure of the iconic Chenab Bridge in April 2021. What is the length of the bridge? |
A. | 1034 m |
B. | 1187 m |
C. | 1245 m |
D. | 1315 m |
E. | 1457 m |
Answer» E. 1457 m | |