MCQOPTIONS
Saved Bookmarks
| 1. |
In which of the following units, design period is maximized? |
| A. | distribution system |
| B. | demand reservoir |
| C. | water treatment unit |
| D. | pipe mains |
| Answer» C. water treatment unit | |