In the network shown in Fig. (15 fig) the latest start time of an activity 4-5 is_________________?
A.
2
B.
4
C.
8
D.
7
Answer» C. 8
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which one of the following is not an excavating and moving type of equipment ?
Which of the following is not a PERT event ?
Which of the following is a weakness of bar chart ?
Whenever an activity has zero total float, then_______________?
Wheeled tractors are replacing crawler tractors because________________?_x005F_x000D_Consider the following statements?_x005F_x000D_1. wheeled tractors travel faster_x005F_x000D_2. crawler tractors are more expensive_x005F_x000D_3. track parts of a crawler wear out quickly_x005F_x000D_4. crawler tractors have stick control
Updating may result in_________________?
Total float for any activity is defined as the difference between________________?
The time with which direct cost does not reduce with the increase in time is known as_________________?
The time corresponding to minimum total project cost is_______________?
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply