

MCQOPTIONS
Saved Bookmarks
1. |
In signals system design of Railways the distance at which the outer signal is to be placed is decided on basis of the |
A. | Allowable speed |
B. | Running speed |
C. | Minimum speed |
D. | Journey speed |
Answer» B. Running speed | |