MCQOPTIONS
Saved Bookmarks
| 1. |
In signals system design of Railways the distance at which the outer signal is to be placed is decided on basis of the |
| A. | Allowable speed |
| B. | Running speed |
| C. | Minimum speed |
| D. | Journey speed |
| Answer» B. Running speed | |