1.
In jack arch floor, the rise is kept
A.
all the above.
B.
1/6th of the span
C.
1/8th of the span
D.
1/10th of the span
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Slate
Pile foundation is generally provided if soil is
To obtain good bonding in brick masonry
The vertical faces of a door opening which support frame of the door, are
For constructing a terrazo floor. Pick up the incorrect statement from the following :
Which one of the following rocks is used for monumental buildings :
The process of keeping concrete moist for a certain period after its finishing, is known as
The type of bond in which every course contains both headers and stretchers, is called
The type of ashlar masonry in which stones are finely chisel dressed and thickness of joints does not exceed 3 mm, is
A concrete structure is set on fire and the temperature raises to 1000°C. The strength of concrete as compared to original strength reduces to
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply