In "full face" method of constructing tunnel, the first operation relates to |
| A. | removal to bottom portion |
| B. | excavation of one drift in the centre |
| C. | removal of top portion |
| D. | excavation being done along the perimeter |
| Answer» D. excavation being done along the perimeter | |