In case of sewer lines |
| A. | water test is carried out to check water tightness of the joints |
| B. | test for straightness is carried out with the help of a lamp and mirror |
| C. | obstruction test is carried out with the. help of smooth ball of diameter 13 mm |
| D. | all the above. |