

MCQOPTIONS
Saved Bookmarks
1. |
In a process costing system, the manufacturing overhead (or factory OH) is usually appliedusing |
A. | Predetermined overhead rate |
B. | An actual overhead rate |
C. | A conversion overhead rate |
D. | An indirect labor rate |
Answer» B. An actual overhead rate | |