In a PERT network, the activity durations are given as to (optimistic), tp (pessimistic) and tm (most likely time). What is the variance of is activity ? |
| A. | [A]. |
| B. | [B]. |
| C. | [C]. |
| D. | None of the above |
| Answer» D. None of the above | |