In a PERT network, the activity durations are given as to (optimistic), tp (pessimistic) and tm (most likely time). What is the variance of is activity ? |
A. | [A]. |
B. | [B]. |
C. | [C]. |
D. | None of the above |
Answer» D. None of the above | |