| 1. |
If the R.L's of canal bed level and high flood level of drainage are 212.0 m and 210.0 mrespectively, then cross drainage work will be |
| A. | aqueduct |
| B. | superpassage |
| C. | syphon |
| D. | syphon aqueduct |
| Answer» D. syphon aqueduct | |