| 1. |
For the network shown in the above figure (the number on each arrow denotes the time duration of activity in days), the earliest star time, in days for activity 5-6 is |
| A. | 8 |
| B. | 7 |
| C. | 9 |
| D. | 11 |
| Answer» B. 7 | |