1.

Depth of scour under bridge pier and abutments is determined by the equation.

A. \(D = 0.473 \left( \frac Q f \right)^{0.67}\)
B. \(D = 0.473 \left( \frac Q f \right)^{0.33}\)
C. \(D = 0.433 \left( \frac Q f \right)^{0.37}\)
D. \(D = 0.433 \left( \frac Q f \right)^{0.33}\)
Answer» C. \(D = 0.433 \left( \frac Q f \right)^{0.37}\)


Discussion

No Comment Found