MCQOPTIONS
Saved Bookmarks
| 1. |
Critical path is a path along which: |
| A. | Earliest finish time (EFT) = Latest finish time (LFT) |
| B. | A path along which LFT > EFT |
| C. | A network of shortest path and consumes minimum time |
| D. | Float is not zero |
| Answer» B. A path along which LFT > EFT | |