Consider the following factors :1. Provision of a suitable slope to the top of the sill.2. Proper throating of the sill to throw off the water outside.3. Giving a projection of not less than 50 mm to the sill.4. Providing damp-proof course below the sill to check the entry of moisture inside the main wall.Those considered while constructing a brick sill would include |
| A. | 1 and 2 |
| B. | 1, 3 and 4 |
| C. | 2, 3 and 4 |
| D. | 1, 2, 3 and 4 |
| Answer» B. 1, 3 and 4 | |