Consider the following assembly with different operations :OperationStandard time, minutesA60B65C29D37E28F63G36H126K64 There are 250 working days in a year to produce 4000 units in a year. The minimum number of work stations required will be

A. 13
B. 12
C. 11
D. 10
Answer» B. 12