MCQOPTIONS
Bookmark
Saved Bookmarks
→
Civil Engineering
→
Hydraulics And Fluid Mechanics in Civil Engineering
→
Before plastering, the surface has to be:..
1.
Before plastering, the surface has to be:
A.
Rough
B.
Smooth
C.
Cemented
D.
Watered
Answer» B. Smooth
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Mud plastering does not require curing.
Which of the below is not a plaster finish?
In a lime-cement plaster, ratio 1:1:6 corresponds to:
Wood surface requires _________ coats of plastering.
In plastering, the 1st coat is called ___________ and its thickness should be _______ mm.
IN_A_LIME-CEMENT_PLASTER,_RATIO_1:1:6_CORRESPONDS_TO:?$
Mud plastering does not require curing.$
Which_of_the_below_is_not_a_plaster_finish?$
Wood surface requires _________ coats of plastering?
___________ are used to press mortar and spread it uniformly.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply