1.

A surface water treatment plant operates round the clock with a flow rate of 35 m3/min. The water temperature is 15°C and jar testing indicated an alum dosage of 25 mg/l with flocculation at a Gt value of 4×104 producing optimal results. The alum quantity required for 30 days (in kg) of operation of the plant is ____________

A. 378
B. 3780
C. 37800
D. 378000
Answer» D. 378000


Discussion

No Comment Found

Related MCQs