

MCQOPTIONS
Saved Bookmarks
1. |
A surface water treatment plant operates round the clock with a flow rate of 35 m3/min. The water temperature is 15°C and jar testing indicated an alum dosage of 25 mg/l with flocculation at a Gt value of 4×104 producing optimal results. The alum quantity required for 30 days (in kg) of operation of the plant is ____________ |
A. | 378 |
B. | 3780 |
C. | 37800 |
D. | 378000 |
Answer» D. 378000 | |