| 1. |
A hydel power project has been envisaged to serve the water supply and irrigation needs of the area at its inception stage. The dam reservoir so constructed is known as |
| A. | multipurpose reservoir |
| B. | single-purpose reservoir |
| C. | distribution reservoir |
| D. | retarding reservoir |
| Answer» B. single-purpose reservoir | |