MCQOPTIONS
Saved Bookmarks
| 1. |
A flexible pavement has 34505678.91 csa and a CBR value of 4%. What would be the thickness of the base course of the pavement? |
| A. | 250 mm |
| B. | 330 mm |
| C. | 130 mm |
| D. | 300 mm |
| Answer» B. 330 mm | |