MCQOPTIONS
Saved Bookmarks
This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Pavement Design knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
NPV method is used to estimate the costs in the life cycle cost analysis. |
| A. | True |
| B. | False |
| Answer» C. | |
| 2. |
What is the main aim of the pavement design process? |
| A. | Weathering |
| B. | Compaction |
| C. | Thickness |
| D. | Strength |
| Answer» D. Strength | |
| 3. |
What is the first step in the construction process of a new pavement? |
| A. | Site investigation |
| B. | Traffic data |
| C. | Determining cross-section |
| D. | Evaluate drainage |
| Answer» C. Determining cross-section | |
| 4. |
Which of the below is not a user cost considered in the life cycle cost analysis? |
| A. | Sunk cost |
| B. | Delay costs |
| C. | Vehicle operating cost |
| D. | Crash costs |
| Answer» B. Delay costs | |
| 5. |
A parallel road is an example of new pavement construction. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 6. |
What step comes after the initial strategy is decided in the life cycle cost analysis method? |
| A. | Estimating costs |
| B. | Analyzing results |
| C. | Evaluating strategies |
| D. | Comparing alternatives |
| Answer» B. Analyzing results | |
| 7. |
Which of the below is not a pavement design category? |
| A. | New pavement |
| B. | Pavement reconstruction |
| C. | Pavement rehabilitation |
| D. | Pavement demolition |
| Answer» E. | |
| 8. |
Which method is used to determine the most cost-effective design and construction procedure? |
| A. | Cost-benefit analysis |
| B. | Deductive economic analysis |
| C. | Life cycle cost analysis |
| D. | Inductive economic analysis |
| Answer» D. Inductive economic analysis | |
| 9. |
What is the factor that ensures a good pavement design process? |
| A. | Communication |
| B. | Location |
| C. | Fund |
| D. | Climate |
| Answer» B. Location | |
| 10. |
______ design needs to be conducted during the early phase of the project. |
| A. | Primary |
| B. | Preliminary |
| C. | Trial |
| D. | Initial |
| Answer» C. Trial | |