

MCQOPTIONS
Saved Bookmarks
This section includes 117 Mcqs, each offering curated multiple-choice questions to sharpen your Artificial Intelligence knowledge and support exam preparation. Choose a topic below to get started.
1. |
The characteristics of well designed system area) Practical b) Effective c) Secure d) Reliable e) Flexible f) Economical |
A. | a, b, c and d |
B. | a, c, d and e |
C. | a, b, c, d and e |
D. | a, b, c, d, e and f |
Answer» E. | |
2. |
.It is necessary to design an information system to easily accommodate change, because |
A. | new computers are introduced every year |
B. | new computer languages become popular every year |
C. | organizations’ requirements change over a period of time |
D. | systems need continuous debugging |
Answer» D. systems need continuous debugging | |
3. |
System approval criteria are specified |
A. | when the final specifications are drawn up |
B. | during feasibility study |
C. | during the requirements specifications stage |
D. | during system study stage |
Answer» B. during feasibility study | |
4. |
It is necessary to prioritize information requirements of an organization at the requirements determination phase as |
A. | it is always good to prioritize |
B. | there are conflicting demands from users |
C. | there are constraints on budgets, available time, human resource and requirement |
D. | all good organization do it |
Answer» D. all good organization do it | |
5. |
In study phase activities, which activity filled the ISR by user |
A. | User review |
B. | User need |
C. | Initial investigation |
D. | System review |
Answer» C. Initial investigation | |
6. |
A data dictionary is useful as(i) it is a documentation aid (ii) it assists in designing input form (iii) it contains al data in an application including temporary data used in processes (iv) it is a good idea in system design |
A. | (i) and (ii) |
B. | (i) and (iv) |
C. | (i),(ii) and (iii) |
D. | (i) and (iv) |
Answer» D. (i) and (iv) | |
7. |
The main goal of arriving at a final specification is |
A. | to tell the organization’s managers how the system will function |
B. | to tell the organization’s managers what the proposed system will achieve in a language understood by them |
C. | to compute the cost of implementing the system |
D. | to assist in designing the system |
Answer» C. to compute the cost of implementing the system | |
8. |
…………… is a good example of deterministic system. |
A. | Life cycle |
B. | Computer Program |
C. | Software Program |
D. | None of the above |
Answer» C. Software Program | |
9. |
A feasibility study is carried out |
A. | after final requirements specifications are drawn up |
B. | during the period when requirements specifications are drawn up |
C. | before the final requirements specifications are drawn up |
D. | at any time |
Answer» D. at any time | |
10. |
Significant codes are(i)concise (ii)meaningful (iii)expandable (iv)comprehensive |
A. | i and ii |
B. | i, ii and iii |
C. | ii, iii and iv |
D. | i, ii and iv |
Answer» D. i, ii and iv | |
11. |
The role of a system analyst drawing up a requirements specification is similar to |
A. | architect designing a building |
B. | a structural engineer designing a building |
C. | a contractor constructing a building |
D. | the workers who construct a building |
Answer» B. a structural engineer designing a building | |
12. |
Data store in a DFD represents. |
A. | a sequential file |
B. | a disk store |
C. | a repository of data |
D. | a random access memory |
Answer» D. a random access memory | |
13. |
In order to understand the working of an organization for which a computer based system is being designed, an analyst must |
A. | look at only current work and document flow in the organization |
B. | discuss with top level and middle level management only |
C. | interview top, middle, line managers and also clerks who will enter data and use the system |
D. | only clerical and middle level staff who have long experience in the organization and will be users of the system |
Answer» D. only clerical and middle level staff who have long experience in the organization and will be users of the system | |
14. |
Feasibility study is carried out by |
A. | managers of the organization |
B. | system analyst in consultation with managers of the organization |
C. | users of the proposed system |
D. | systems designers in consultation with the prospective users of the system |
Answer» C. users of the proposed system | |
15. |
In ISR which field indicates the purpose of job |
A. | Objective |
B. | Anticipated benefits |
C. | Output description |
D. | None of these |
Answer» B. Anticipated benefits | |
16. |
To create vehicle of information to provide evidence in the development process and tomonitor the process. This is one of the objectives of |
A. | Analysis |
B. | Design |
C. | Development |
D. | Documentation |
Answer» E. | |
17. |
The code is developed with the measurable properties of an item is known |
A. | Group classification code |
B. | Self checking code |
C. | Significant digit code |
D. | Numeric code |
Answer» D. Numeric code | |
18. |
Translating the problem statement into a series of sequential stepsdescribing what the program must do is known as: |
A. | coding. |
B. | debugging. |
C. | creating the algorithm. |
D. | writing documentation. |
Answer» D. writing documentation. | |
19. |
The document prepared after study phase is known as |
A. | Performance specification |
B. | Design specification |
C. | System specification |
D. | None of these |
Answer» B. Design specification | |
20. |
The ____________ determines whether the project should go forward. |
A. | feasibility assessment |
B. | opportunity identification |
C. | system evaluation |
D. | program specification |
Answer» B. opportunity identification | |
21. |
Group classification codes are(i)concise (ii)meaningful (iii) expandable (iv)comprehensive |
A. | i and ii |
B. | i, ii and iii |
C. | ii, iii and iv |
D. | i, ii and iv |
Answer» D. i, ii and iv | |
22. |
Serial numbers used as codes are(i) concise (ii ) meaningful (iii) expandable (iv) comprehensive |
A. | i and ii |
B. | ii and iii |
C. | ii and iv |
D. | i and iii |
Answer» E. | |
23. |
The major goal of requirement determination phase of information system development is |
A. | determine whether information is needed by an organization |
B. | determine what information is needed by an organization |
C. | determine how information needed by an organization can be provided |
D. | determine when information is to be given |
Answer» C. determine how information needed by an organization can be provided | |
24. |
Requirement specification is carried out |
A. | after requirements are determined |
B. | before requirements are determined |
C. | simultaneously with requirements determination |
D. | independent of requirements determination |
Answer» B. before requirements are determined | |
25. |
A data cannot flow between a store andi) a store ii) a process iii) an external entity |
A. | i and iii |
B. | i and ii |
C. | ii and iii |
D. | ii |
Answer» B. i and ii | |
26. |
The final specifications are arrived at |
A. | after feasibility study |
B. | during feasibility study |
C. | just before implementation phase |
D. | when the system is being designed |
Answer» B. during feasibility study | |
27. |
Hardware study is carried out |
A. | after the final system is specified |
B. | at the requirements specification stage |
C. | before the requirements are specified |
D. | whenever management decides it is necessary |
Answer» B. at the requirements specification stage | |
28. |
Increased volume of sales is an example of ………….…. Benefit. Reduction of baddebts is an example of ……….. |
A. | Tangible, Intangible |
B. | Tangible, Tangible |
C. | Intangible, Tangible |
D. | Intangible, Intangible |
Answer» E. | |
29. |
The make-or-buy decision is associated with the ____________ step inthe SDLC. |
A. | Problem/Opportunity Identification |
B. | Design |
C. | Analysis |
D. | Development and Documentation |
Answer» C. Analysis | |
30. |
Organization chart is a type of |
A. | basic chart |
B. | IPO chart |
C. | Hierarchical chart |
D. | step chart |
Answer» D. step chart | |
31. |
After Development phase, a document is prepared |
A. | Program specification |
B. | Design specification |
C. | System specification |
D. | None of these |
Answer» D. None of these | |
32. |
Information requirements of an organization can be determined by |
A. | interviewing managers and users and arriving at the requirements based on consensus |
B. | finding out what similar organizations do |
C. | telling organization what they need based on your experience |
D. | sending a questionnaire to all employees of the organization |
Answer» B. finding out what similar organizations do | |
33. |
………………….. means coordinated effort, to communicate the information of thesystem written form. |
A. | System documentation |
B. | Resource required |
C. | Development schedule |
D. | User Document |
Answer» B. Resource required | |
34. |
In the Analysis phase, the development of the ____________ occurs,which is a clear statement of the goals and objectives of the project. |
A. | documentation |
B. | flowchart |
C. | program specification |
D. | design |
Answer» D. design | |
35. |
Changing the relationship with and services provided to customers in such a way thatthey will not think of changing suppliers is called …………. |
A. | Lock in customers |
B. | Lock out customers |
C. | Lock in competitors |
D. | Lock out competitors |
Answer» B. Lock out customers | |
36. |
In DFD which symbol represents the process |
A. | Circle |
B. | Rectangle |
C. | Square |
D. | Open ended rectangle |
Answer» B. Rectangle | |
37. |
____________ is the process of translating a task into a series ofcommands that a computer will use to perform that task. |
A. | Project design |
B. | Installation |
C. | Systems analysis |
D. | Programming |
Answer» E. | |
38. |
Sequence numbering of records is used to(i)Identify each record uniquely (ii)Track a missing record in a batch of records (iii)Count number of records (iv) Sort the records |
A. | i, ii |
B. | i, ii, iii |
C. | i, ii, iii, iv |
D. | i and iv |
Answer» D. i and iv | |
39. |
Initial requirements specification is |
A. | not changed till the end of the project |
B. | continuously changed during project implementation |
C. | only a rough indication of the requirement |
D. | changed and finalized after feasibility study |
Answer» D. changed and finalized after feasibility study | |
40. |
Translating the algorithm into a programming language occurs at the____________ step of the PDLC. |
A. | Debugging |
B. | Coding |
C. | Testing and Documentation |
D. | Algorithm Development |
Answer» C. Testing and Documentation | |
41. |
Block codes are (i)concise (ii )meaningful (iii)expandable (iv)comprehensive |
A. | i and ii |
B. | ii and iii |
C. | iii and iv |
D. | i and iii |
Answer» C. iii and iv | |
42. |
Among the attributes of a good systems analyst the following are essentiali) knowledge of organization ii) analytical mind iii) ability to communicate orally iv) excellent mathematical abilities |
A. | i and ii |
B. | i, ii and iii |
C. | i, ii and iv |
D. | i, iii and iv |
Answer» C. i, ii and iv | |
43. |
The main ingredient of the report documenting the ……………… is the cost benefitanalysis. |
A. | System Analysis |
B. | Feasibility Study |
C. | System Analyst |
D. | System Design |
Answer» C. System Analyst | |
44. |
By an external entity we mean a |
A. | Unit outside the system being designed which can be controlled by an analyst. |
B. | Unit outside the system whose behavior is independent of the system being designed |
C. | A unit external to the system being designed |
D. | A unit which is not part of a DFD |
Answer» D. A unit which is not part of a DFD | |
45. |
It is necessary to consult the following while drawing up requirement specification |
A. | only top managers |
B. | only top and middle management |
C. | only top, middle and operational managers |
D. | top, middle and operational managers and also all who will use the system |
Answer» E. | |
46. |
It is necessary to carry out a feasibility study as |
A. | top management can not ensure that a project is feasible before calling a system analyst |
B. | top management is not sure what they want from the system |
C. | even though top management is in favor of the system, technology may not be mature for implementation |
D. | all organizations do it |
Answer» D. all organizations do it | |
47. |
…………… system consists of programs, data files and documentation |
A. | Conceptual |
B. | Logical |
C. | Physical |
D. | None of the above |
Answer» D. None of the above | |
48. |
Graphic representation of the control logic of processing functions or modules representing asystem, is known as: |
A. | Structured analysis |
B. | Structured chart |
C. | Structured English |
D. | System Flow chart |
Answer» C. Structured English | |
49. |
Hardware study is required |
A. | to find out cost of computer system needed |
B. | to determine the type of computer system and software tools needed to meet the final system specification |
C. | to make sure that the system does not become obsolete |
D. | to find how to implement the system |
Answer» C. to make sure that the system does not become obsolete | |
50. |
System analysts have to interact withi) managers of organizations ii) users in the organization iii) programming team iv) data entry operator |
A. | iii and iv |
B. | i, ii and iii |
C. | ii, iii and iv |
D. | ii and iii |
Answer» C. ii, iii and iv | |