MCQOPTIONS
Saved Bookmarks
| 1. |
System approval criteria are specified |
| A. | when the final specifications are drawn up |
| B. | during feasibility study |
| C. | during the requirements specifications stage |
| D. | during system study stage |
| Answer» B. during feasibility study | |