 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 19 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | The loss of water from leaves present on embankment is called __________ | 
| A. | Evaporation | 
| B. | Transpiration | 
| C. | Sublimation | 
| D. | Boiling | 
| Answer» C. Sublimation | |
| 2. | The D85 point size is given by __________ | 
| A. | Dp | 
| B. | 2Dp | 
| C. | 3Dp | 
| D. | 4Dp | 
| Answer» C. 3Dp | |
| 3. | To fulfill the adequate permeability the D15 of filter/D15 of foundation ratio should be greater than __________ | 
| A. | 5 | 
| B. | 10 | 
| C. | 15 | 
| D. | 20 | 
| Answer» B. 10 | |
| 4. | The clay seal may be provided if the seepage zone is at a depth of less than __________ | 
| A. | 1.2 m | 
| B. | 1.0 m | 
| C. | 0.9 m | 
| D. | 0.6m to 0.9 m | 
| Answer» E. | |
| 5. | The total interruption to traffic in a year should not exceed __________ | 
| A. | 45 days | 
| B. | 40 days | 
| C. | 30 days | 
| D. | 15 days | 
| Answer» E. | |
| 6. | The GWT should be at a distance of _______ from ground level. | 
| A. | 0.5 m | 
| B. | 0.6 m | 
| C. | 1.2 m | 
| D. | 5.0 m | 
| Answer» D. 5.0 m | |
| 7. | What is the minimum diameter used in pipe culverts? | 
| A. | 25 cm | 
| B. | 35 cm | 
| C. | 45 cm | 
| D. | 75 cm | 
| Answer» E. | |
| 8. | The span of RCC slab is limited to __________ | 
| A. | 1 m | 
| B. | 1.5 m | 
| C. | 2.0 m | 
| D. | 3.0 m | 
| Answer» E. | |
| 9. | In slab culverts RCC slab is placed over abudment of __________ | 
| A. | Masonry | 
| B. | Pre stressed | 
| C. | Steel | 
| D. | Composite | 
| Answer» B. Pre stressed | |
| 10. | THE_D85_POINT_SIZE_IS_GIVEN_BY.?$ | 
| A. | Dp | 
| B. | 2Dp | 
| C. | 3Dp | 
| D. | 4Dp | 
| Answer» C. 3Dp | |
| 11. | The_loss_of_water_from_leaves_present_on_embankment_is_called.$ | 
| A. | Evaporation | 
| B. | Transpiration | 
| C. | Sublimation | 
| D. | Boiling | 
| Answer» C. Sublimation | |
| 12. | To fulfill the adequate permeability the D15 of filter/D15 of foundation ratio should be greater than? | 
| A. | 5 | 
| B. | 10 | 
| C. | 15 | 
| D. | 20 | 
| Answer» B. 10 | |
| 13. | The capillary control can be controlled by how many methods? | 
| A. | One | 
| B. | Two | 
| C. | Three | 
| D. | Four | 
| Answer» C. Three | |
| 14. | The clay seal may be provided if seepage zone is at a depth of less than. | 
| A. | 1.2 m | 
| B. | 1.0 m | 
| C. | 0.9 m | 
| D. | 0.6m to 0.9 m | 
| Answer» E. | |
| 15. | The total interruption to traffic in a year should not exceed. | 
| A. | 45 days | 
| B. | 40 days | 
| C. | 30 days | 
| D. | 15 days | 
| Answer» E. | |
| 16. | The GWT should be at a distance of ___ from ground level. | 
| A. | 0.5 m | 
| B. | 0.6 m | 
| C. | 1.2 m | 
| D. | 5.0 m | 
| Answer» D. 5.0 m | |
| 17. | The minimum diameter used in pipe culverts is. | 
| A. | 25 cm | 
| B. | 35 cm | 
| C. | 45 cm | 
| D. | 75 cm | 
| Answer» E. | |
| 18. | The span of RCC slab is limited to. | 
| A. | 1 m | 
| B. | 1.5 m | 
| C. | 2.0 m | 
| D. | 3.0 m | 
| Answer» E. | |
| 19. | In slab culverts RCC slab is placed over abudment of. | 
| A. | Masonry | 
| B. | Pre stressed | 
| C. | Steel | 
| D. | Composite | 
| Answer» B. Pre stressed | |