| 1. |
Standardized_control_chart_approach_for_short_production_runs_was_presented_by____$ |
| A. | Rodriguez |
| B. | Roberts |
| C. | Crowder |
| D. | Farnum |
| Answer» E. | |
| 2. |
The DNOM approach does not need the measurements to be taken at all. |
| A. | True |
| B. | False |
| Answer» C. | |
| 3. |
The standardized control chart approach for short production runs can only be applied on variable control charts. |
| A. | True |
| B. | False |
| Answer» C. | |
| 4. |
Which of these is correct target value for standardized control chart for fraction nonconforming for shorter production runs? |
| A. | <span style="text-decoration:overline;">p</span> |
| B. | n<span style="text-decoration:overline;">p</span> |
| C. | <span style="text-decoration:overline;">c</span> |
| D. | RÃÖ |
| Answer» B. n<span style="text-decoration:overline;">p</span> | |
| 5. |
Which_of_these_is_true_according_to_Farnum? |
| A. | The coefficient of the variation should be randomly varying |
| B. | The coefficient of the variation should be systematically varying |
| C. | The coefficient of the variation should be varying, maybe randomly or systematically |
| D. | The coefficient of the variation must be constant |
| Answer» E. | |
| 6. |
Tj stands for __? |
| A. | Target value for relative range |
| B. | Target value for relative mean |
| C. | target value for x bar for each part number |
| D. | Target value for tested value of the variable |
| Answer» D. Target value for tested value of the variable | |
| 7. |
Rj is the _____ |
| A. | Target value for range |
| B. | Target value for ratios |
| C. | Result of jth part |
| D. | Ratio of jth part |
| Answer» B. Target value for ratios | |
| 8. |
The term Mi, which is used in the expression of the standard variable used in standardized x bar charts for short production runs, is defined as ___ |
| A. | Average of averages of standard deviations |
| B. | Average of original mean measurements |
| C. | Moving average |
| D. | Exponentially weighted moving average |
| Answer» C. Moving average | |
| 9. |
Which of these has the same difference between the LCL and Center line, and the UCL and the center line? |
| A. | Standardized R chart for short production runs |
| B. | Standardized x bar charts for short production runs |
| C. | Both, standardized x bar and R charts for short production runs |
| D. | Neither one of the standardized R chart and standardized x bar charts for short production runs |
| Answer» C. Both, standardized x bar and R charts for short production runs | |
| 10. |
The standardized x bar chart has the value of LCL, when used for short production runs is ____ |
| A. | 3 |
| B. | –A<sub>2</sub> |
| C. | 1 |
| D. | A<sub>2</sub> |
| Answer» E. | |
| 11. |
What is the value of LCL of the standardized R chart for short runs? |
| A. | D<sub>4</sub> |
| B. | D<sub>2</sub> |
| C. | D<sub>1</sub> |
| D. | D<sub>3</sub> |
| Answer» E. | |
| 12. |
What is the UCL of the standardized R chart for short production runs? |
| A. | D<sub>4</sub> |
| B. | D<sub>5</sub> |
| C. | D<sub>1</sub> |
| D. | D<sub>2</sub> |
| Answer» B. D<sub>5</sub> | |