MCQOPTIONS
Saved Bookmarks
This section includes 14 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The DNOM approach does not need the measurements to be taken at all. |
| A. | True |
| B. | False |
| Answer» C. | |
| 2. |
The standardized control chart approach for short production runs can only be applied on variable control charts. |
| A. | True |
| B. | False |
| Answer» C. | |
| 3. |
Which of these is correct target value for standardized control chart for fraction nonconforming for shorter production runs? |
| A. | p |
| B. | np |
| C. | c |
| D. | R̅ |
| Answer» B. np | |
| 4. |
Which of these is true according to Farnum? |
| A. | The coefficient of the variation should be randomly varying |
| B. | The coefficient of the variation should be systematically varying |
| C. | The coefficient of the variation should be varying, maybe randomly or systematically |
| D. | The coefficient of the variation must be constant |
| Answer» E. | |
| 5. |
According to Farnum, the coefficient of variation is _____________ |
| A. | \(\frac{σ}{μ}\) |
| B. | \(\frac{μ}{σ}\) |
| C. | \(\frac{2σ}{μ}\) |
| D. | \(\frac{2μ}{σ}\) |
| Answer» B. \(\frac{μ}{σ}\) | |
| 6. |
Standardized control chart approach for short production runs was presented by ____________ |
| A. | Rodriguez |
| B. | Roberts |
| C. | Crowder |
| D. | Farnum |
| Answer» E. | |
| 7. |
Tj stands for __________ |
| A. | Target value for relative range |
| B. | Target value for relative mean |
| C. | target value for x bar for each part number |
| D. | Target value for tested value of the variable |
| Answer» D. Target value for tested value of the variable | |
| 8. |
Rj is the ____________ |
| A. | Target value for range |
| B. | Target value for ratios |
| C. | Result of jth part |
| D. | Ratio of jth part |
| Answer» B. Target value for ratios | |
| 9. |
The term Mi, which is used in the expression of the standard variable used in standardized x bar charts for short production runs, is defined as ___________ |
| A. | Average of averages of standard deviations |
| B. | Average of original mean measurements |
| C. | Moving average |
| D. | Exponentially weighted moving average |
| Answer» C. Moving average | |
| 10. |
Which of these has the same difference between the LCL and Center line, and the UCL and the center line? |
| A. | Standardized R chart for short production runs |
| B. | Standardized x bar charts for short production runs |
| C. | Both, standardized x bar and R charts for short production runs |
| D. | Neither one of the standardized R chart and standardized x bar charts for short production runs |
| Answer» C. Both, standardized x bar and R charts for short production runs | |
| 11. |
The standardized x bar chart has the value of LCL when used for short production runs is ____________ |
| A. | 3 |
| B. | –A2 |
| C. | 1 |
| D. | A2 |
| Answer» E. | |
| 12. |
What is the value of standard variable plotted in the standardized x bar chart for short run production? |
| A. | \(\bar{x}_i^s=\frac{\bar{M}_i-T_j}{2\bar{R}_j}\) |
| B. | \(\bar{x}_i^s=\frac{\bar{M}_i+T_j}{\bar{R}_j}\) |
| C. | \(\bar{x}_i^s=\frac{\bar{M}_i-T_j}{\bar{R}_j}\) |
| D. | \(\bar{x}_i^s=\frac{2\bar{M}_i-T_j}{\bar{R}_j}\) |
| Answer» D. \(\bar{x}_i^s=\frac{2\bar{M}_i-T_j}{\bar{R}_j}\) | |
| 13. |
What is the value of LCL of the standardized R chart for short runs? |
| A. | D4 |
| B. | D2 |
| C. | D1 |
| D. | D3 |
| Answer» E. | |
| 14. |
What is the UCL of the standardized R chart for short production runs? |
| A. | D4 |
| B. | D5 |
| C. | D1 |
| D. | D2 |
| Answer» B. D5 | |