Explore topic-wise MCQs in Computer Science Engineering (CSE).

This section includes 454 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science Engineering (CSE) knowledge and support exam preparation. Choose a topic below to get started.

1.

Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as

A. functional testing
B. stress/load testing
C. recovery testing
D. integration testing
Answer» C. recovery testing
2.

The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as

A. delivery document
B. baseline document
C. checklist
Answer» C. checklist
3.

The ‘v’ represent the following term:

A. verification and validation
B. static testing and dynamic testing
C. black box testing and white box testing
D. software development process and software testing process
Answer» E.
4.

Apache is an open source Java application designed toload test functional behavior and gauge software performance.

A. a.junit
B. b.selenium
C. c.jmeter
D. d.loader
Answer» D. d.loader
5.

The first step in Software Development Life Cycle(SDLC) is

A. preliminary investigation and analysis
B. system design
C. system testing
D. coding
Answer» B. system design
6.

Assured quality is necessary for building customer confidence.

A. correct
B. correct to some extent
C. correct to great extent
D. incorrect
Answer» B. correct to some extent
7.

… are used to validate software models by enumerating inconsistencies and finding defects.

A. review tools
B. static analysis tools
C. modeling tools
D. test design tools
Answer» D. test design tools
8.

Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below defects per millionopportunities (DPMO).

A. 2.4
B. 2
C. 3
D. 3.4
Answer» E.
9.

… helps with identifying inconsistent or missing requirements.

A. requirements management tools
B. test management tools
C. incident management tools
D. configuration management tools
Answer» B. test management tools
10.

… are necessary for storage and version management of testware and related software.

A. requirements management tools
B. test management tools
C. incident management tools
D. configuration management tools
Answer» E.
11.

Which automation framework step is based on the inputprovided by the gap analysis.

A. a.work plan
B. b.businesscase
C. c.requirement anlysiss
D. riskmanagement
Answer» D. riskmanagement
12.

The Cause and Effect diagram is a visual tool to explore all the that may be causingor contributing to a particular problem

A. potential factors
B. similar factors
C. unrealistic factors
D. none of the above
Answer» B. similar factors
13.

The pareto chart is a thatallows us to focus on the issues that are causing the biggest problem, and thus maximize our impact.

A. prioritization tool
B. mu sigma
C. ishikawa tool
D. all of the above
Answer» B. mu sigma
14.

… execute test objects using the automated test scripts.

A. test data preparation tools
B. monitoring tools
C. dynamic analysis tools
D. test execution tools
Answer» E.
15.

Choose the correct option according to the given statements regarding risk management.Statement 1: A risk is a potential problem—it might happen, it might not.Statement 2: Managers, software engineers, and customers participate in risk analysis and management. Statement 3: Only Managers participate in risk analysis and management.

A. statement 1and 2 are correct.
B. only statement 1 is correct.
C. only statement 3 is correct.
D. statement 1and 3 are correct.
Answer» B. only statement 1 is correct.
16.

Data are onthe check sheet to recordthe frequency of specific events during a datacollection period.

A. “collected and tabulated”
B. "circulated"
C. "reported"
D. none of the above
Answer» B. "circulated"
17.

The main focus of is to reduce defects andvariations in the processes.

A. qa
B. qc
C. six sigma
D. none of the above
Answer» D. none of the above
18.

What is the aim of fool proofing technique used for total quality management?

A. to achieve zero defects
B. to specify time cschedule
C. to specify targets
D. none of the aove
Answer» B. to specify time cschedule
19.

.Innovation is the activity leading tochanges.

A. planned
B. accidental
C. virtual
D. user
Answer» B. accidental
20.

… are used in component and component integration testing and when testing middleware.

A. test data preparation tools
B. monitoring tools
C. dynamic analysis tools
D. test execution tools
Answer» D. test execution tools
21.

Which of the following statements about SRS is/aretrue ? i. SRS is written by customer ii. SRS is written by a developer iii. SRS serves as a contract between customer and developer

A. only i is true
B. both ii and iii are true
C. all are true
D. none of the above
Answer» D. none of the above
22.

Risk mitigation is a risk activity. Riskmonitoring is a activity

A. avoidance, project tracking.
B. increasing, project tracking.
C. project tracking, avoidance.
D. random, tracking.
Answer» B. increasing, project tracking.
23.

........... happens when defect introduced in one phase passes to another phase without getting caught in the phase-end verification or validation activities.

A. defect cascading
B. defect prevention
C. qc
D. defect leakage
Answer» E.
24.

In which step automation framework is identified as an "ideal world" scenario.

A. a.future state
B. b.current state
C. c.business case
D. d.work plan
Answer» B. b.current state
25.

The diagram is a problem-solving toolthat investigates and analizessystematically all the potential or real causes that result in a single effect.

A. cause and effect
B. pareto
C. histogram
D. all of the above
Answer» B. pareto
26.

Kaizen is a – process the purpose of which goes beyond simple productivity improvement.

A. weekly
B. daily
C. monthly
D. annual
Answer» C. monthly
27.

Customers are primarily concerned with______________

A. communicatio n, courtesy, and credibility of the sales person
B. competence, courtesy, and security of the sales person
C. competence, responsiveness, and reliability of the sales person
D. communication, responsiveness, and cleverness of the sales person
Answer» B. competence, courtesy, and security of the sales person
28.

"The degree to which a set of inherent characteristics of an object fulfils requirements" is known as

A. conformity
B. quality
C. grade
D. none of the above.
Answer» B. quality
29.

What allows to implement application specific test automation solution by adding so,e extra code

A. a.test automationframework
B. b.test complexity
C. c.reporting
D. d.maintainan ce cost
Answer» B. b.test complexity
30.

What are the criteria to decide the testing efforts?1. Time and budget2. Size of development team3. Size of testers4. Risk associated with project

A. a. 1, 3, 4
B. b. 1, 2, 3
C. c. 1, 4
D. d. 1, 3
Answer» D. d. 1, 3
31.

Defect is a technique that was developed toestimate the number of defects resident in a piece of software.

A. density
B. seeding
C. age
D. latency
Answer» C. age
32.

In Six Sigma, a is defined as anyprocess output that does not meet customer specifications

A. error
B. cost
C. quality
D. defect
Answer» E.
33.

What is the main aim of Software Configuration Management(SCM)?

A. identifychange
B. controlchange
C. ensure thatchange is
D. all of theabove
Answer» E.
34.

Bug status is set to postpone due to _.

A. priority of that bug may low.
B. lack of time for the release.
C. the bug may not be the major effect in the software.
D. data may be unavailable.
Answer» E.
35.

If you were to create client/server applications, whichmodel would you go for?

A. winwin spiralmodel
B. spiral model
C. concurrentmodel
D. incrementalmodel
Answer» D. incrementalmodel
36.

ISO – 14001 gives stress on ___________

A. plan – do-check -act
B. environmental protection
C. prevention rather than detection
D. all of the above
Answer» E.
37.

When an expected result is not specified in test case template then _.

A. we cannot run the test.
B. it may be difficult to determine if the test has passed or failed.
C. it may be difficult to repeat the test.
D. we cannot automate the user inputs.
Answer» C. it may be difficult to repeat the test.
38.

A tool is piece of software that enables people to definesoftware testing tasks.

A. a.testautomation
B. b.selenium
C. c.hpe
D. d.ranorex
Answer» B. b.selenium
39.

A product which is manufactured by using the degree of the design specification…

A. quality of conformance
B. quality control
C. quality assurance
D. none of the above.
Answer» B. quality control
40.

Which of the following statements is/are false?1. Fault tree analysis method is used to determine reliability of product2. The goal of Six Sigma is to reduce number of defects to 2.4 parts per billion3. Six sigma is represented by normal distribution curve4. Poka yoke is a policy which prevents occurrence of human errors

A. only statement 3
B. statement 2 andstatement 3
C. only statement 2
D. statement 1, 3and 4
Answer» D. statement 1, 3and 4
41.

Which testing cannot be performed on first build of the software?

A. regression testing
B. retesting
C. a,b
D. none
Answer» D. none
42.

Verification and Validation uses _.

A. internal and external resources respectively.
B. internal resources only.
C. external resources only.
D. external and internal resources respectively.
Answer» B. internal resources only.
43.

Which Testing is performed first?

A. black box testing
B. white box testing
C. dynamic testing
D. static testing
Answer» E.
44.

… store and manage defects, failure, change requests, or perceived problems and anomalies.

A. requirements management tools
B. test management tools
C. incident management tools
D. configuration management tools
Answer» D. configuration management tools
45.

The main goal of Automation Testing is to the numberof test cases to be run manually

A. a.increase
B. b.reduce
C. c.enlarge
D. d.multiply
Answer» C. c.enlarge
46.

What is the final outcome of the requirements analysis and specifications phase ?

A. drawing the data flow diagram
B. the srs document
C. coding the project
D. the user manual
Answer» C. coding the project
47.

Select which option is not true about SQA…?

A. audits and reviews to be performed by the team
B. amount of technical work to be performed
C. evaluations to be performed
D. documents that are produced by the sqa team.
Answer» D. documents that are produced by the sqa team.
48.

A is an existing defect that hasn’t yet ust becauseanother defect has yet caused a failure because the exact set of conditions were never met.

A. mutant defect
B. bksu defect
C. latent defect
D. delayed defect
Answer» D. delayed defect
49.

Software Configuration Management (SCM) is an umbrella activity.

A. true
B. false
Answer» B. false
50.

Select the people who identify the document and verifies the correctness of the software…

A. project manager
B. sqa team
C. project team
D. all of the mentioned
Answer» C. project team