

MCQOPTIONS
Saved Bookmarks
This section includes 454 Mcqs, each offering curated multiple-choice questions to sharpen your Computer Science Engineering (CSE) knowledge and support exam preparation. Choose a topic below to get started.
1. |
Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as |
A. | functional testing |
B. | stress/load testing |
C. | recovery testing |
D. | integration testing |
Answer» C. recovery testing | |
2. |
The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as |
A. | delivery document |
B. | baseline document |
C. | checklist |
Answer» C. checklist | |
3. |
The ‘v’ represent the following term: |
A. | verification and validation |
B. | static testing and dynamic testing |
C. | black box testing and white box testing |
D. | software development process and software testing process |
Answer» E. | |
4. |
Apache is an open source Java application designed toload test functional behavior and gauge software performance. |
A. | a.junit |
B. | b.selenium |
C. | c.jmeter |
D. | d.loader |
Answer» D. d.loader | |
5. |
The first step in Software Development Life Cycle(SDLC) is |
A. | preliminary investigation and analysis |
B. | system design |
C. | system testing |
D. | coding |
Answer» B. system design | |
6. |
Assured quality is necessary for building customer confidence. |
A. | correct |
B. | correct to some extent |
C. | correct to great extent |
D. | incorrect |
Answer» B. correct to some extent | |
7. |
… are used to validate software models by enumerating inconsistencies and finding defects. |
A. | review tools |
B. | static analysis tools |
C. | modeling tools |
D. | test design tools |
Answer» D. test design tools | |
8. |
Processes that operate with "six sigma quality" over the short term are assumed to produce long-term defect levels below defects per millionopportunities (DPMO). |
A. | 2.4 |
B. | 2 |
C. | 3 |
D. | 3.4 |
Answer» E. | |
9. |
… helps with identifying inconsistent or missing requirements. |
A. | requirements management tools |
B. | test management tools |
C. | incident management tools |
D. | configuration management tools |
Answer» B. test management tools | |
10. |
… are necessary for storage and version management of testware and related software. |
A. | requirements management tools |
B. | test management tools |
C. | incident management tools |
D. | configuration management tools |
Answer» E. | |
11. |
Which automation framework step is based on the inputprovided by the gap analysis. |
A. | a.work plan |
B. | b.businesscase |
C. | c.requirement anlysiss |
D. | riskmanagement |
Answer» D. riskmanagement | |
12. |
The Cause and Effect diagram is a visual tool to explore all the that may be causingor contributing to a particular problem |
A. | potential factors |
B. | similar factors |
C. | unrealistic factors |
D. | none of the above |
Answer» B. similar factors | |
13. |
The pareto chart is a thatallows us to focus on the issues that are causing the biggest problem, and thus maximize our impact. |
A. | prioritization tool |
B. | mu sigma |
C. | ishikawa tool |
D. | all of the above |
Answer» B. mu sigma | |
14. |
… execute test objects using the automated test scripts. |
A. | test data preparation tools |
B. | monitoring tools |
C. | dynamic analysis tools |
D. | test execution tools |
Answer» E. | |
15. |
Choose the correct option according to the given statements regarding risk management.Statement 1: A risk is a potential problem—it might happen, it might not.Statement 2: Managers, software engineers, and customers participate in risk analysis and management. Statement 3: Only Managers participate in risk analysis and management. |
A. | statement 1and 2 are correct. |
B. | only statement 1 is correct. |
C. | only statement 3 is correct. |
D. | statement 1and 3 are correct. |
Answer» B. only statement 1 is correct. | |
16. |
Data are onthe check sheet to recordthe frequency of specific events during a datacollection period. |
A. | “collected and tabulated” |
B. | "circulated" |
C. | "reported" |
D. | none of the above |
Answer» B. "circulated" | |
17. |
The main focus of is to reduce defects andvariations in the processes. |
A. | qa |
B. | qc |
C. | six sigma |
D. | none of the above |
Answer» D. none of the above | |
18. |
What is the aim of fool proofing technique used for total quality management? |
A. | to achieve zero defects |
B. | to specify time cschedule |
C. | to specify targets |
D. | none of the aove |
Answer» B. to specify time cschedule | |
19. |
.Innovation is the activity leading tochanges. |
A. | planned |
B. | accidental |
C. | virtual |
D. | user |
Answer» B. accidental | |
20. |
… are used in component and component integration testing and when testing middleware. |
A. | test data preparation tools |
B. | monitoring tools |
C. | dynamic analysis tools |
D. | test execution tools |
Answer» D. test execution tools | |
21. |
Which of the following statements about SRS is/aretrue ? i. SRS is written by customer ii. SRS is written by a developer iii. SRS serves as a contract between customer and developer |
A. | only i is true |
B. | both ii and iii are true |
C. | all are true |
D. | none of the above |
Answer» D. none of the above | |
22. |
Risk mitigation is a risk activity. Riskmonitoring is a activity |
A. | avoidance, project tracking. |
B. | increasing, project tracking. |
C. | project tracking, avoidance. |
D. | random, tracking. |
Answer» B. increasing, project tracking. | |
23. |
........... happens when defect introduced in one phase passes to another phase without getting caught in the phase-end verification or validation activities. |
A. | defect cascading |
B. | defect prevention |
C. | qc |
D. | defect leakage |
Answer» E. | |
24. |
In which step automation framework is identified as an "ideal world" scenario. |
A. | a.future state |
B. | b.current state |
C. | c.business case |
D. | d.work plan |
Answer» B. b.current state | |
25. |
The diagram is a problem-solving toolthat investigates and analizessystematically all the potential or real causes that result in a single effect. |
A. | cause and effect |
B. | pareto |
C. | histogram |
D. | all of the above |
Answer» B. pareto | |
26. |
Kaizen is a – process the purpose of which goes beyond simple productivity improvement. |
A. | weekly |
B. | daily |
C. | monthly |
D. | annual |
Answer» C. monthly | |
27. |
Customers are primarily concerned with______________ |
A. | communicatio n, courtesy, and credibility of the sales person |
B. | competence, courtesy, and security of the sales person |
C. | competence, responsiveness, and reliability of the sales person |
D. | communication, responsiveness, and cleverness of the sales person |
Answer» B. competence, courtesy, and security of the sales person | |
28. |
"The degree to which a set of inherent characteristics of an object fulfils requirements" is known as |
A. | conformity |
B. | quality |
C. | grade |
D. | none of the above. |
Answer» B. quality | |
29. |
What allows to implement application specific test automation solution by adding so,e extra code |
A. | a.test automationframework |
B. | b.test complexity |
C. | c.reporting |
D. | d.maintainan ce cost |
Answer» B. b.test complexity | |
30. |
What are the criteria to decide the testing efforts?1. Time and budget2. Size of development team3. Size of testers4. Risk associated with project |
A. | a. 1, 3, 4 |
B. | b. 1, 2, 3 |
C. | c. 1, 4 |
D. | d. 1, 3 |
Answer» D. d. 1, 3 | |
31. |
Defect is a technique that was developed toestimate the number of defects resident in a piece of software. |
A. | density |
B. | seeding |
C. | age |
D. | latency |
Answer» C. age | |
32. |
In Six Sigma, a is defined as anyprocess output that does not meet customer specifications |
A. | error |
B. | cost |
C. | quality |
D. | defect |
Answer» E. | |
33. |
What is the main aim of Software Configuration Management(SCM)? |
A. | identifychange |
B. | controlchange |
C. | ensure thatchange is |
D. | all of theabove |
Answer» E. | |
34. |
Bug status is set to postpone due to _. |
A. | priority of that bug may low. |
B. | lack of time for the release. |
C. | the bug may not be the major effect in the software. |
D. | data may be unavailable. |
Answer» E. | |
35. |
If you were to create client/server applications, whichmodel would you go for? |
A. | winwin spiralmodel |
B. | spiral model |
C. | concurrentmodel |
D. | incrementalmodel |
Answer» D. incrementalmodel | |
36. |
ISO – 14001 gives stress on ___________ |
A. | plan – do-check -act |
B. | environmental protection |
C. | prevention rather than detection |
D. | all of the above |
Answer» E. | |
37. |
When an expected result is not specified in test case template then _. |
A. | we cannot run the test. |
B. | it may be difficult to determine if the test has passed or failed. |
C. | it may be difficult to repeat the test. |
D. | we cannot automate the user inputs. |
Answer» C. it may be difficult to repeat the test. | |
38. |
A tool is piece of software that enables people to definesoftware testing tasks. |
A. | a.testautomation |
B. | b.selenium |
C. | c.hpe |
D. | d.ranorex |
Answer» B. b.selenium | |
39. |
A product which is manufactured by using the degree of the design specification… |
A. | quality of conformance |
B. | quality control |
C. | quality assurance |
D. | none of the above. |
Answer» B. quality control | |
40. |
Which of the following statements is/are false?1. Fault tree analysis method is used to determine reliability of product2. The goal of Six Sigma is to reduce number of defects to 2.4 parts per billion3. Six sigma is represented by normal distribution curve4. Poka yoke is a policy which prevents occurrence of human errors |
A. | only statement 3 |
B. | statement 2 andstatement 3 |
C. | only statement 2 |
D. | statement 1, 3and 4 |
Answer» D. statement 1, 3and 4 | |
41. |
Which testing cannot be performed on first build of the software? |
A. | regression testing |
B. | retesting |
C. | a,b |
D. | none |
Answer» D. none | |
42. |
Verification and Validation uses _. |
A. | internal and external resources respectively. |
B. | internal resources only. |
C. | external resources only. |
D. | external and internal resources respectively. |
Answer» B. internal resources only. | |
43. |
Which Testing is performed first? |
A. | black box testing |
B. | white box testing |
C. | dynamic testing |
D. | static testing |
Answer» E. | |
44. |
… store and manage defects, failure, change requests, or perceived problems and anomalies. |
A. | requirements management tools |
B. | test management tools |
C. | incident management tools |
D. | configuration management tools |
Answer» D. configuration management tools | |
45. |
The main goal of Automation Testing is to the numberof test cases to be run manually |
A. | a.increase |
B. | b.reduce |
C. | c.enlarge |
D. | d.multiply |
Answer» C. c.enlarge | |
46. |
What is the final outcome of the requirements analysis and specifications phase ? |
A. | drawing the data flow diagram |
B. | the srs document |
C. | coding the project |
D. | the user manual |
Answer» C. coding the project | |
47. |
Select which option is not true about SQA…? |
A. | audits and reviews to be performed by the team |
B. | amount of technical work to be performed |
C. | evaluations to be performed |
D. | documents that are produced by the sqa team. |
Answer» D. documents that are produced by the sqa team. | |
48. |
A is an existing defect that hasn’t yet ust becauseanother defect has yet caused a failure because the exact set of conditions were never met. |
A. | mutant defect |
B. | bksu defect |
C. | latent defect |
D. | delayed defect |
Answer» D. delayed defect | |
49. |
Software Configuration Management (SCM) is an umbrella activity. |
A. | true |
B. | false |
Answer» B. false | |
50. |
Select the people who identify the document and verifies the correctness of the software… |
A. | project manager |
B. | sqa team |
C. | project team |
D. | all of the mentioned |
Answer» C. project team | |