51.

Testing of individual components by the developers are comes under which type of testing?

A. integration testing
B. validation testing
C. unit testing
D. none of the above
Answer» D. none of the above
52.

_______ is a Software Configuration Management concept that helps us to control change.

A. baseline
B. procedure
C. audit
D. none of the above
Answer» B. procedure
53.

Histogram is very useful tool to describe a of the frequencydistribution ofobserved values of a variable

A. sense
B. quality
C. measurement
D. all of the above
Answer» B. quality
54.

CMM model in Software Engineering is a technique of______ .

A. develop the software.
B. improve the software process.
C. improve the testing process.
D. all of above
Answer» C. improve the testing process.
55.

Beta testing will be done at

A. user place
B. developers place
Answer» B. developers place
56.

Unit Testing will be done by

A. testers
B. end users
C. customer
D. developers
Answer» E.
57.

------------- means under what test environment(Hardware, software set up. the application will run smoothly

A. test bed
B. checkpoint
C. code walk through
D. checklist
Answer» B. checkpoint
58.

Management and Measurement, It will come under

A. cmm level 1
B. cmm level 3
C. cmm level 4
D. cmm level 2
Answer» D. cmm level 2
59.

The name of the testing which is done to make sure the existing features are not affected by new changes

A. recursive testing
B. whitebox testing
C. unit testing
D. regression testing
Answer» E.
60.

Quality plan describes the quality procedures and standards that will be used in a project.

A. false
B. true
Answer» C.
61.

Application should be stable. Clear Design and Flow of the application is needed for Automation testing.

A. false
B. true
Answer» C.
62.

Check Sheet(Checklist. is considered a simple , but powerful statistical tool because it differentiates between two extremes.

A. true
B. false
Answer» B. false
63.

A metric used to measure the characteristic of the methods, Techniques and tools employed in developing, implementing and maintaining the software system called as

A. process metric
B. product metric
C. test metrics
Answer» B. product metric
64.

Which Software Development Life cycle model will require to start Testing Activities when starting development activities itself

A. water falls model
B. spiral model
C. v-model
D. linear model
Answer» D. linear model
65.

Validation plan describes the approach ,resources and schedule used for system validation

A. true
B. false
Answer» B. false
66.

Beta testing will be done by

A. developer
B. user
C. tester
Answer» C. tester
67.

Maintenance Plan predicts the maintenance requirements of the system, maintenance costs and effort required

A. true
B. false
Answer» B. false
68.

Conducted to validate that the application, database, and network they may be running on can handle projected volumes of users and data effectively. The test is conducted jointly by developers, testers, DBA’s and network associates after the system Testing called as

A. functional testing
B. stress/load testing
C. recovery testing
D. integration testing
Answer» C. recovery testing
69.

What is correct Software Process Cycle?

A. plan(p)------>check(c)------>act(a)----->do(d)
B. plan(p)------>do(d)------>check(c)----->act(a)
C. plan(p)------>do(d)------>act(a)----->check(c)
Answer» C. plan(p)------>do(d)------>act(a)----->check(c)
70.

This type of test include, how well the user will be able to understand and interact with the system?

A. usability testing
B. user acceptance testing
C. alpha testing
D. beta testing.
Answer» B. user acceptance testing
71.

This Testing Technique examines the basic program structure and it derives the test data from the program logic; Ensuring that all statements and conditions executed at least once. It is called as

A. block box testing
B. white box testing
C. grey box testing
D. closed box testing
Answer» C. grey box testing
72.

Standards and procedures for managing changes in an evolving software product is called?

A. confirmation management
B. confederation mangement
C. configuration management
D. compartability management
Answer» D. compartability management
73.

It provides a set of levels and an assessment model, and presents a set of recommended practices that allow organizations to improve their testing processes.

A. tim (testing improving model)
B. tmm (testing maturity model)
C. tqm(total quality management)
Answer» B. tmm (testing maturity model)
74.

Alpha testing will be done at,

A. user\s site
B. developers\ site
Answer» C.
75.

An Important metric is the number of defects found in internal testing compared to the defects found in customer tests, Status of test activities against the plan, Test coverage achieved so far, comes under

A. process metric
B. product metric
C. test metric
Answer» D.
76.

Retesting modules connected to the program or component after a change has been made?

A. full regression testing
B. unit regression
C. regional regression
D. retesting.
Answer» D. retesting.
77.

Software Testing is a process of evaluating a system by manual or automatic means and verify that it satisfies specified requirements or identity differences between expected and actual results.

A. true
B. false
Answer» B. false
78.

Stratification is a Technique used to analyze/divide a universe of data into homogeneous groups(stratA..

A. true
B. false
Answer» B. false
79.

Which is Black-Box Testing method?

A. equivalence partitioning
B. code coverage
C. fault injection
Answer» B. code coverage
80.

The process that deals with the technical and management issues of software development called as?

A. delivery process
B. testing process
C. software process
Answer» D.
81.

Which is non-functional software testing?

A. unit testing
B. block box testing
C. performance testing
D. regression testing
Answer» D. regression testing
82.

It measures the quality of a product It is a specific part of the QA procedure, It is a corrective process, It applies for particular product & Deals with the product.

A. validation
B. verification
C. quality assurance
D. quality control
Answer» E.
83.

Software testing which is done without planning and Documentation is known as

A. adhoc testing
B. unit testing
C. regression testing
D. functional testing.
Answer» B. unit testing
84.

This type of testing method attempts to find incorrect or missing functions, errors in data structures or external database access, interface errors, Performance errors and initialization and Termination errors. It is called as

A. white box testing
B. grey box testing
C. black box testing
D. open box testing
Answer» D. open box testing
85.

Configuration Management Plan describes the Configuration Management procedures and structures to be used.

A. true
B. false
Answer» B. false
86.

The testing which is done by going thro' the code is known as,

A. unit testing
B. blackbox testing
C. white box testing
D. regression testing
Answer» D. regression testing
87.

Requirement and Analysis, Design, Development or Coding, Testing and Maintenance is called as Software Development Life Cycle (SDLC)

A. true
B. false
Answer» B. false
88.

Name the events that will be analyzed, Count the named incidents, Rank the count by frequency using a bar chart & Validate reasonableness of the analysis is called as

A. pareto analysis
B. cause and effect diagram
C. swot analysis
D. pie charts
Answer» B. cause and effect diagram
89.

White box testing is not called as___________

A. glass box testing
B. closed box testing
C. open box testing
D. clear box testing
Answer» C. open box testing
90.

It measures the quality of processes used to create a quality product. It is a system of management activities, It is a preventive process, It applies for entire life cycle & Deals with Process.

A. validation
B. verification
C. quality assurance
D. quality control
Answer» D. quality control
91.

A useful tool to visualize, clarify, link, identify, and classify possible cause of a problem. This is also called as “fishbone diagram” what is this?

A. pareto analysis
B. cause-and-effect diagram
Answer» C.
92.

Cost of quality = Prevention Cost + Appraisal cost + Failure cost

A. true
B. false
Answer» B. false
93.

The review and approved document (i.e. Test plan, System Requirement Specification’s) is called as

A. delivery document
B. baseline document
C. checklist
Answer» C. checklist
94.

A Non-Functional Software testing done to check if the user interface is easy to use and understand

A. usability testing
B. security testing
C. unit testing
D. block box testing
Answer» B. security testing
95.

It is a set of levels that defines a testing maturity hierarchy

A. tim (testing improving model)
B. tmm (testing maturity model)
C. tqm(total quality management)
Answer» C. tqm(total quality management)
96.

Staff development plan describes how the skills and experience of the project team members will be developed.

A. true
B. false
Answer» B. false
97.

To check whether we have developed the product according to the customer requirements r not. It is a Dynamic process.

A. validation
B. verification
C. quality assurance
D. quality control
Answer» B. verification
98.

To check whether we are developing the right product according to the customer requirements are not. It is a static process

A. validation
B. verification
C. quality assurance
D. quality control
Answer» C. quality assurance
99.

Control Charts is a statistical technique to assess, monitor, and maintain the stability of a process.

A. true
B. false
Answer» B. false
100.

Executing the same test case by giving the number of inputs on same build called as

A. regression testing
B. retesting
C. ad hoc testing
D. sanity testing
Answer» C. ad hoc testing