| 1. | The spacing between construction joints in rigid pavement is? | 
| A. | 4.5 m | 
| B. | 5.0 m | 
| C. | 5.5 m | 
| D. | 6.0 m | 
| Answer» C. 5.5 m | |
| 2. | The base course uses __________ | 
| A. | RCC | 
| B. | Wet lean concrete | 
| C. | Dry lean concrete | 
| D. | Heavy weight concrete | 
| Answer» D. Heavy weight concrete | |
| 3. | The drainage layer of pavement can __________ | 
| A. | Increase the pavement life | 
| B. | Decrease the pavement life | 
| C. | Increase the pavement thickness | 
| D. | Decrease the pavement thickness | 
| Answer» B. Decrease the pavement life | |
| 4. | What is the failure in GSB layer of rigid pavement? | 
| A. | Pumping | 
| B. | Blowing | 
| C. | Pumping and blowing | 
| D. | Fatigue | 
| Answer» D. Fatigue | |
| 5. | What is the size of particles preferred in GSB layer of pavement? | 
| A. | 0.075 mm | 
| B. | 0.150 mm | 
| C. | 0.300 mm | 
| D. | 0.600 mm | 
| Answer» B. 0.150 mm | |
| 6. | Failure in rigid pavement occurs due to __________ | 
| A. | More compaction | 
| B. | Less compaction | 
| C. | More load | 
| D. | Less load | 
| Answer» C. More load | |
| 7. | The soil sub grade design is done by __________ | 
| A. | Plate bearing test | 
| B. | CBR | 
| C. | Plate load test | 
| D. | Shear test | 
| Answer» B. CBR | |
| 8. | The cement slab is provided with __________ | 
| A. | Long joints | 
| B. | Longitudinal joints | 
| C. | Transverse joints | 
| D. | Both Longitudinal and transverse joints. | 
| Answer» E. | |
| 9. | The layer not required in cement road is __________ | 
| A. | Sub grade | 
| B. | Sub base | 
| C. | Base | 
| D. | Surface | 
| Answer» D. Surface | |
| 10. | The PQC denotes __________ | 
| A. | Paved quality cement | 
| B. | Paved quality concrete | 
| C. | Pavement quality concrete | 
| D. | Paved quantity cement | 
| Answer» D. Paved quantity cement | |
| 11. | THE_SPACING_BETWEEN_CONSTRUCTION_JOINTS_IN_RIGID_PAVEMENT_IS?$ | 
| A. | 4.5 m | 
| B. | 5.0 m | 
| C. | 5.5 m | 
| D. | 6.0 m | 
| Answer» C. 5.5 m | |
| 12. | THE_BASE_COURSE_USES?$ | 
| A. | RCC | 
| B. | Wet lean concrete | 
| C. | Dry lean concrete | 
| D. | Heavy weight concrete | 
| Answer» D. Heavy weight concrete | |
| 13. | The drainage layer of pavement ca? | 
| A. | Increase the pavement life | 
| B. | Decrease the pavement life | 
| C. | Increase the pavement thickness | 
| D. | Decrease the pavement thickness | 
| Answer» B. Decrease the pavement life | |
| 14. | The failure in GSB layer of rigid pavement is | 
| A. | Pumping | 
| B. | Blowing | 
| C. | Pumping and blowing | 
| D. | Fatigue | 
| Answer» D. Fatigue | |
| 15. | The size of particles preferred in GSB layer of pavement is | 
| A. | 0.075 mm | 
| B. | 0.150 mm | 
| C. | 0.300 mm | 
| D. | 0.600 mm | 
| Answer» B. 0.150 mm | |
| 16. | Failure in rigid pavement occurs due to | 
| A. | More compaction | 
| B. | Less compaction | 
| C. | More load | 
| D. | Less load | 
| Answer» C. More load | |
| 17. | The soil sub grade design is done by | 
| A. | Plate bearing test | 
| B. | CBR | 
| C. | Plate load test | 
| D. | Shear test | 
| Answer» B. CBR | |
| 18. | The cement slab is provided with | 
| A. | Long joints | 
| B. | Longitudinal joints | 
| C. | Transverse joints | 
| D. | Both Longitudinal and transverse joints. | 
| Answer» E. | |
| 19. | The layer not required in cement road is | 
| A. | Sub grade | 
| B. | Sub base | 
| C. | Base | 
| D. | Surface | 
| Answer» D. Surface | |
| 20. | The PQC denotes | 
| A. | Paved quality cement | 
| B. | Paved quality concrete | 
| C. | Pavement quality concrete | 
| D. | Paved quantity cement | 
| Answer» D. Paved quantity cement | |