MCQOPTIONS
Saved Bookmarks
This section includes 16 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The utility unit as per saturation system for a population of less 1001 to 2000 is? |
| A. | 0.25 |
| B. | 0.50 |
| C. | 1.00 |
| D. | 2.00 |
| Answer» D. 2.00 | |
| 2. |
The final step after fixing the optimum length of the road is? |
| A. | Financing |
| B. | Construction |
| C. | Phasing |
| D. | Preparation of master plan |
| Answer» D. Preparation of master plan | |
| 3. |
The determination of optimum length is based on ______________ |
| A. | Saturation system |
| B. | Geometric design |
| C. | Type of highway |
| D. | Length of highway |
| Answer» B. Geometric design | |
| 4. |
The master plan may not be prepared for ______________ |
| A. | Village |
| B. | City |
| C. | State |
| D. | Country |
| Answer» B. City | |
| 5. |
The accident cost analysis is estimated by conducting ______________ |
| A. | Origin and destination |
| B. | Traffic survey |
| C. | Transportation facilities |
| D. | Geometric design |
| Answer» C. Transportation facilities | |
| 6. |
Planning is based on _______________ |
| A. | Factual data |
| B. | Analysis |
| C. | Scientific data |
| D. | Factual data and analysis |
| Answer» E. | |
| 7. |
THE_FINAL_STEP_AFTER_FIXING_THE_OPTIMUM_LENGTH_OF_THE_ROAD?$ |
| A. | Financing |
| B. | Construction |
| C. | Phasing |
| D. | Preparation of master plan |
| Answer» D. Preparation of master plan | |
| 8. |
The_utility_unit_as_per_saturation_system_for_a_population_of_less_1001_to_2000_is$ |
| A. | 0.25 |
| B. | 0.50 |
| C. | 1.00 |
| D. | 2.00 |
| Answer» D. 2.00 | |
| 9. |
The determination of optimum length is based o? |
| A. | Saturation system |
| B. | Geometric design |
| C. | Type of highway |
| D. | Length of highway |
| Answer» B. Geometric design | |
| 10. |
The master plan may not be prepared for |
| A. | Village |
| B. | City |
| C. | State |
| D. | Country |
| Answer» B. City | |
| 11. |
The topographic survey is conducted to estimate which of the following characteristics? |
| A. | Engineering |
| B. | Traffic |
| C. | Financial |
| D. | Soil |
| Answer» B. Traffic | |
| 12. |
The accident cost analysis is estimated by conducting |
| A. | Origin and destination |
| B. | Traffic survey |
| C. | Transportation facilities |
| D. | Geometric design |
| Answer» C. Transportation facilities | |
| 13. |
The revenue from road transport sector is studied in which type of studies? |
| A. | Economic |
| B. | Financial |
| C. | Traffic |
| D. | Engineering |
| Answer» C. Traffic | |
| 14. |
The estimates are studied in which type of studies? |
| A. | Economic studies |
| B. | Financial studies |
| C. | Traffic studies |
| D. | Engineering studies |
| Answer» B. Financial studies | |
| 15. |
The planning survey consists of how many numbers of studies? |
| A. | One |
| B. | Two |
| C. | Three |
| D. | Four |
| Answer» E. | |
| 16. |
Planning is based on |
| A. | Factual data |
| B. | Analysis |
| C. | Scientific data |
| D. | Factual data and analysis |
| Answer» E. | |