			MCQOPTIONS
 Saved Bookmarks
				This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
| 1. | In SIPOC diagram, P stands for _______ | 
| A. | Process | 
| B. | Product | 
| C. | Progress | 
| D. | Profit | 
| Answer» B. Product | |
| 2. | DMAIC can be carried out without tollgate reviews. | 
| A. | True | 
| B. | False | 
| Answer» C. | |
| 3. | Projects with high potential negative impact are _____ | 
| A. | Most desirable | 
| B. | Least desirable | 
| C. | Having highest risk | 
| D. | Have a low risk | 
| Answer» D. Have a low risk | |
| 4. | A DMAIC process is implemented on a process only when ______ | 
| A. | There are signs of potential breakthrough | 
| B. | It is estimated that quality of products will decrease in near future | 
| C. | Exceptionally bad quality review of a product | 
| D. | When the project impact of DMAIC is estimated low | 
| Answer» B. It is estimated that quality of products will decrease in near future | |
| 5. | Process capability tests are a part of _____ step of DMAIC process. | 
| A. | Define | 
| B. | Improvement | 
| C. | Measure | 
| D. | Control | 
| Answer» D. Control | |
| 6. | Tollgate reviews are done _______ | 
| A. | Before each step of DMAIC | 
| B. | After DMAIC process ending | 
| C. | Before the whole DMAIC process | 
| D. | After each step of DMAIC process | 
| Answer» E. | |
| 7. | DFSS refers to _____ | 
| A. | Development of Six-Sigma | 
| B. | Design for Six-Sigma | 
| C. | Define for Six-Sigma | 
| D. | Development for Six-Sigma | 
| Answer» C. Define for Six-Sigma | |
| 8. | Improve step of DMAIC can also be changed by Design step in the case of some processes. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 9. | Tollgate reviews are presented to managers and “owner” of a process __________ in the six-sigma organizations. | 
| A. | The project champions and the black belts not working directly on the project | 
| B. | Industrial engineering team | 
| C. | Quality control manager | 
| D. | Developers of the factory | 
| Answer» B. Industrial engineering team | |
| 10. | The Cause and Defect Diagram is a part of _____ step of DMAIC process. | 
| A. | Define | 
| B. | Analyze | 
| C. | Control | 
| D. | Measure | 
| Answer» E. | |
| 11. | PSP is expanded as ____ | 
| A. | Problem Solving Process | 
| B. | Product safeguarding process | 
| C. | Product Sampling Process | 
| D. | Project Settling Procedure | 
| Answer» B. Product safeguarding process | |
| 12. | DMAIC is often associated with ______ | 
| A. | Six-sigma activities | 
| B. | Kaizen board | 
| C. | 5-s | 
| D. | Acceptance sampling | 
| Answer» B. Kaizen board | |
| 13. | Which of these is not a part of the Define step of DMAIC process? | 
| A. | Verify and gain approval for final solutions | 
| B. | Define critical customer requirements | 
| C. | Establish project charter and build team | 
| D. | Document process | 
| Answer» B. Define critical customer requirements | |
| 14. | What DMAIC process does is, to _______ | 
| A. | Manufacture any product | 
| B. | Define specification limits for a product | 
| C. | Solve root cause of quality and process problems | 
| D. | Define quality system standards | 
| Answer» D. Define quality system standards | |
| 15. | DMAIC stands for ______ | 
| A. | Do-Measure-Act-Implement-Check | 
| B. | Define-Measure-Act-Implement-Control | 
| C. | Define-Measure-Analyze-Improve-Control | 
| D. | Do-Measure-Analyze-Improve-Control | 
| Answer» D. Do-Measure-Analyze-Improve-Control | |