MCQOPTIONS
Saved Bookmarks
| 1. |
Projects with high potential negative impact are _____ |
| A. | Most desirable |
| B. | Least desirable |
| C. | Having highest risk |
| D. | Have a low risk |
| Answer» D. Have a low risk | |