This section includes 9 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The highest point provided on the pavement is ___________ |
| A. | Crown |
| B. | Camber |
| C. | Cross slope |
| D. | Drainage |
| Answer» B. Camber | |
| 2. |
The structure provided on the pavement to remove the storm water is ___________ |
| A. | Drainage |
| B. | Camber |
| C. | Crown |
| D. | Curves |
| Answer» C. Crown | |
| 3. |
The water that cannot be drained of by gravity is called ___________ |
| A. | Pore water |
| B. | Held water |
| C. | Gravitational water |
| D. | Capillary water |
| Answer» D. Capillary water | |
| 4. |
The seepage flow is present in ___________ |
| A. | Surface drainage |
| B. | Sub surface drainage |
| C. | Camber |
| D. | Cross slope |
| Answer» C. Camber | |
| 5. |
The surface drainage doesn t consist of ___________ |
| A. | Camber |
| B. | Road side drains |
| C. | Culverts |
| D. | Curves |
| Answer» E. | |
| 6. |
The removal and diversion of surface water from the roadway is called ___________ |
| A. | Surface drainage |
| B. | Sub surface drainage |
| C. | Camber |
| D. | Cross slope |
| Answer» B. Sub surface drainage | |
| 7. |
The surface water is obtained from ___________ |
| A. | Ground water |
| B. | Rainfall |
| C. | Leakage of water from water treatment plants |
| D. | None of the mentioned |
| Answer» C. Leakage of water from water treatment plants | |
| 8. |
The number of important factors for highway engineer are ___________ |
| A. | One |
| B. | Two |
| C. | Three |
| D. | Four |
| Answer» D. Four | |
| 9. |
The process of removing and controlling excess surface and sub soil water within roadway is ___________ |
| A. | Highway Engineering |
| B. | Highway maintenance |
| C. | Highway drainage |
| D. | Highway finance |
| Answer» D. Highway finance | |