			MCQOPTIONS
 Saved Bookmarks
				This section includes 19 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | The highest point provided on the pavement is ___________ | 
| A. | Crown | 
| B. | Camber | 
| C. | Cross slope | 
| D. | Drainage | 
| Answer» B. Camber | |
| 2. | The structure provided on the pavement to remove the storm water is ___________ | 
| A. | Drainage | 
| B. | Camber | 
| C. | Crown | 
| D. | Curves | 
| Answer» C. Crown | |
| 3. | The water that cannot be drained of by gravity is called ___________ | 
| A. | Pore water | 
| B. | Held water | 
| C. | Gravitational water | 
| D. | Capillary water | 
| Answer» D. Capillary water | |
| 4. | The seepage flow is present in ___________ | 
| A. | Surface drainage | 
| B. | Sub surface drainage | 
| C. | Camber | 
| D. | Cross slope | 
| Answer» C. Camber | |
| 5. | The surface drainage doesn’t consist of ___________ | 
| A. | Camber | 
| B. | Road side drains | 
| C. | Culverts | 
| D. | Curves | 
| Answer» E. | |
| 6. | The removal and diversion of surface water from the roadway is called ___________ | 
| A. | Surface drainage | 
| B. | Sub surface drainage | 
| C. | Camber | 
| D. | Cross slope | 
| Answer» B. Sub surface drainage | |
| 7. | The surface water is obtained from ___________ | 
| A. | Ground water | 
| B. | Rainfall | 
| C. | Leakage of water from water treatment plants | 
| D. | None of the mentioned | 
| Answer» C. Leakage of water from water treatment plants | |
| 8. | The number of important factors for highway engineer are ___________ | 
| A. | One | 
| B. | Two | 
| C. | Three | 
| D. | Four | 
| Answer» D. Four | |
| 9. | The process of removing and controlling excess surface and sub soil water within roadway is ___________ | 
| A. | Highway Engineering | 
| B. | Highway maintenance | 
| C. | Highway drainage | 
| D. | Highway finance | 
| Answer» D. Highway finance | |
| 10. | THE_STRUCTURE_PROVIDED_ON_THE_PAVEMENT_TO_REMOVE_THE_STORM_WATER_IS.?$ | 
| A. | Drainage | 
| B. | Camber | 
| C. | Crown | 
| D. | Curves | 
| Answer» C. Crown | |
| 11. | The_highest_point_provided_on_the_pavement_is.$ | 
| A. | Crown | 
| B. | Camber | 
| C. | Cross slope | 
| D. | Drainage | 
| Answer» B. Camber | |
| 12. | The water that cannot be drained of by gravity is called? | 
| A. | Pore water | 
| B. | Held water | 
| C. | Gravitational water | 
| D. | Capillary water | 
| Answer» D. Capillary water | |
| 13. | The seepage flow is present in. | 
| A. | Surface drainage | 
| B. | Sub surface drainage | 
| C. | Camber | 
| D. | Cross slope | 
| Answer» C. Camber | |
| 14. | The surface drainage doesn’t consist of$ | 
| A. | Camber | 
| B. | Road side drains | 
| C. | Culverts | 
| D. | Curves | 
| Answer» E. | |
| 15. | The removal and diversion of surface water from the roadway is called. | 
| A. | Surface drainage | 
| B. | Sub surface drainage | 
| C. | Camber | 
| D. | Cross slope | 
| Answer» B. Sub surface drainage | |
| 16. | The surface water is obtained from. | 
| A. | Ground water | 
| B. | Rainfall | 
| C. | Leakage of water from water treatment plants | 
| D. | None of the above | 
| Answer» C. Leakage of water from water treatment plants | |
| 17. | The highway drainage system consists of how many types? | 
| A. | One | 
| B. | Two | 
| C. | Three | 
| D. | Four | 
| Answer» C. Three | |
| 18. | The number of important factors for highway engineer are. | 
| A. | One | 
| B. | Two | 
| C. | Three | 
| D. | Four | 
| Answer» D. Four | |
| 19. | The process of removing and controlling excess surface and sub soil water within roadway is. | 
| A. | Highway Engineering | 
| B. | Highway maintenance | 
| C. | Highway drainage | 
| D. | Highway finance | 
| Answer» D. Highway finance | |