1.

Which of the following is the most reasonable time taken by an organization to implement TPM?

A. Two days
B. Three years
C. Five days
D. Fifty years
Answer» C. Five days
2.

Which of the following loss refers to the equipment’s inability to get to steady state quickly after a change?

A. Breakdown
B. Start-up loss
C. Defects and rework
D. Benchmarking
Answer» C. Defects and rework
3.

Which of the following is not an advantage of autonomous maintenance?

A. Sense of ownership in operators
B. Increases operator knowledge of equipment
C. Ensures clean and lubricated equipment
D. Demotes customer satisfaction
Answer» E.
4.

Which pillar of TPM focuses on routine maintenance?

A. Training and Education
B. Just-in-time
C. 5S
D. Autonomous maintenance
Answer» E.
5.

Which of the following is not a goal shared by TPM?

A. Zero defects
B. Maximum productivity
C. Minimum productivity
D. Zero breakdowns
Answer» D. Zero breakdowns
6.

Which of the following is not a loss that TPM focuses on reducing?

A. Equipment breakdown
B. Defects and rework
C. Idling and minor stoppages
D. Optimized equipment cycle time
Answer» E.
7.

Which of the following loss refers to the gradual deterioration in equipment cycle times?

A. Increased speed
B. Reduced speed
C. Maximum speed
D. Optimum speed
Answer» C. Maximum speed
8.

Breakdowns lead to long interruptions.

A. True
B. False
Answer» B. False
9.

MP in Total Productive Maintenance refers to ______

A. Main program
B. Main part
C. Maintenance prevention
D. Major part
Answer» D. Major part
10.

TQM focuses on achieving autonomous maintenance.

A. True
B. False
Answer» B. False
11.

Which of the following is not a type of loss examined by TPM?

A. Down-time loss
B. Speed loss
C. Defect loss
D. Forecasting loss
Answer» E.