

MCQOPTIONS
Saved Bookmarks
This section includes 9 Mcqs, each offering curated multiple-choice questions to sharpen your Total Quality Management knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which of the following is not an advantage of implementing TPM? |
A. | Improved equipment reliability |
B. | Reduced equipment downtime |
C. | Increased equipment downtime |
D. | Lower maintenance and production costs |
Answer» D. Lower maintenance and production costs | |
2. |
TPM ensures an improved return on investment. |
A. | True |
B. | False |
Answer» B. False | |
3. |
Improved safety is one of the benefits of implementing TPM. |
A. | True |
B. | False |
Answer» B. False | |
4. |
If the overall equipment effectiveness is 40%, availability 82%, quality score 96%, calculate the performance efficiency? |
A. | 50.8% |
B. | 60.8% |
C. | 70.8% |
D. | 40.8% |
Answer» B. 60.8% | |
5. |
If the theoretical cycle time per unit is 0.5 minutes/unit, the number of units is 400, and the operating time is 400 minutes, calculate performance efficiency. |
A. | 20% |
B. | 30% |
C. | 40% |
D. | 50% |
Answer» E. | |
6. |
If the loading time is 400 minutes and downtime is 60 minutes, calculate availability. |
A. | 81% |
B. | 83% |
C. | 85% |
D. | 87% |
Answer» D. 87% | |
7. |
A machine that was supposed to run for 10 hours suffers a breakdown and runs only for 9 hours. Calculate availability. |
A. | 89% |
B. | 90% |
C. | 91% |
D. | 92% |
Answer» C. 91% | |
8. |
What is the quality score if an asset produces 15000 units out of which 500 are defective? |
A. | 92.67% |
B. | 94.67% |
C. | 96.67% |
D. | 98.67% |
Answer» D. 98.67% | |
9. |
If availability is 85%, performance efficiency is 50%, and the rate of quality products is 98%, then find out the overall equipment effectiveness? |
A. | 42% |
B. | 50% |
C. | 32% |
D. | 60% |
Answer» B. 50% | |