Which of the following is not an advantage of implementing TPM? |
| A. | Improved equipment reliability |
| B. | Reduced equipment downtime |
| C. | Increased equipment downtime |
| D. | Lower maintenance and production costs |
| Answer» D. Lower maintenance and production costs | |
| 2. |
TPM ensures an improved return on investment. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 3. |
Improved safety is one of the benefits of implementing TPM. |
| A. | True |
| B. | False |
| Answer» B. False | |
| 4. |
If the overall equipment effectiveness is 40%, availability 82%, quality score 96%, calculate the performance efficiency? |
| A. | 50.8% |
| B. | 60.8% |
| C. | 70.8% |
| D. | 40.8% |
| Answer» B. 60.8% | |
| 5. |
If the theoretical cycle time per unit is 0.5 minutes/unit, the number of units is 400, and the operating time is 400 minutes, calculate performance efficiency. |
| A. | 20% |
| B. | 30% |
| C. | 40% |
| D. | 50% |
| Answer» E. | |
| 6. |
If the loading time is 400 minutes and downtime is 60 minutes, calculate availability. |
| A. | 81% |
| B. | 83% |
| C. | 85% |
| D. | 87% |
| Answer» D. 87% | |
| 7. |
A machine that was supposed to run for 10 hours suffers a breakdown and runs only for 9 hours. Calculate availability. |
| A. | 89% |
| B. | 90% |
| C. | 91% |
| D. | 92% |
| Answer» C. 91% | |
| 8. |
What is the quality score if an asset produces 15000 units out of which 500 are defective? |
| A. | 92.67% |
| B. | 94.67% |
| C. | 96.67% |
| D. | 98.67% |
| Answer» D. 98.67% | |
| 9. |
If availability is 85%, performance efficiency is 50%, and the rate of quality products is 98%, then find out the overall equipment effectiveness? |
| A. | 42% |
| B. | 50% |
| C. | 32% |
| D. | 60% |
| Answer» B. 50% | |