| 1. | PDCA cycle is also termed as PDSA cycle. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 2. | Lack of constancy of purpose means ________ | 
| A. | low short term profits | 
| B. | low long term profits | 
| C. | inferior strategically planning about the continuous improvement | 
| D. | lack of investment planning | 
| Answer» D. lack of investment planning | |
| 3. | Mobility of top management is described as _______ | 
| A. | constant improvement of processes | 
| B. | management by visible figures alone | 
| C. | performance reviews on the basis of short-term performance | 
| D. | manager not taking important decisions about business | 
| Answer» E. | |
| 4. | Which of these is not the part of Deming’s 7 diseases of Management? | 
| A. | Lack of constancy of purpose | 
| B. | Emphasis on short-term profits | 
| C. | Emphasis on Long term profits | 
| D. | Mobility of top management | 
| Answer» D. Mobility of top management | |
| 5. | How many points did Deming give to elaborate methods for quality improvement? | 
| A. | 10 | 
| B. | 12 | 
| C. | 23 | 
| D. | 14 | 
| Answer» E. | |
| 6. | Which of the following is not based on Deming’s points? | 
| A. | Focus on continuous improvement | 
| B. | An ongoing program of education of employees is necessary | 
| C. | Reach the slogans and numerical goals for the workplace | 
| D. | Elimination of numerical quotas and work standards | 
| Answer» D. Elimination of numerical quotas and work standards | |
| 7. | “We can rely on mass inspection to control quality.” | 
| A. | True | 
| B. | False | 
| Answer» C. | |
| 8. | Quality assurance is related to _____ | 
| A. | strategic activities to ensure the financial plans | 
| B. | set of activities that ensures that the services and product meet the requirements | 
| C. | set of activities that ensures that the supplier-customer quality issues are properly resolved | 
| D. | set of activities that include inspection and planning | 
| Answer» D. set of activities that include inspection and planning | |
| 9. | The highest reduction in the variability from one unit of product to other can be obtained by ______ | 
| A. | statistical process control | 
| B. | acceptance Sampling | 
| C. | design of Experiments | 
| D. | design of Experiments with automatic control | 
| Answer» E. | |
| 10. | Which of these is not a part of feedback control? | 
| A. | Engineering control | 
| B. | Automatic control | 
| C. | Acceptance sampling | 
| D. | Routine adjustment | 
| Answer» D. Routine adjustment | |
| 11. | Control chart is a useful ______ | 
| A. | manufacturing process | 
| B. | process monitoring technique | 
| C. | off-line quality control tool | 
| D. | part of acceptance sampling techniques | 
| Answer» C. off-line quality control tool | |
| 12. | Factorial design is a _______ | 
| A. | off-line quality control tool | 
| B. | on-Line quality control tool | 
| C. | in-process procedure | 
| D. | redundancy plan | 
| Answer» B. on-Line quality control tool | |
| 13. | In the Factorial design type of design of experiments, which of these points are used? | 
| A. | Controlling noise factors | 
| B. | Outgoing inspection | 
| C. | Incoming inspection | 
| D. | Testing outputs of all possible combination of factor levels | 
| Answer» E. | |
| 14. | In the low level of maturity of any organization, the technique of quality improvement that is used the most is _________ | 
| A. | acceptance sampling | 
| B. | statistical process control | 
| C. | design of experiments | 
| D. | regression analysis | 
| Answer» B. statistical process control | |