MCQOPTIONS
Saved Bookmarks
| 1. |
Which of these is not a part of feedback control? |
| A. | Engineering control |
| B. | Automatic control |
| C. | Acceptance sampling |
| D. | Routine adjustment |
| Answer» D. Routine adjustment | |