This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
The miscellaneous road factor for maintenance is __________ |
| A. | Surface of pavement |
| B. | Shoulder |
| C. | Kerbs and median |
| D. | Geometric design |
| Answer» D. Geometric design | |
| 2. |
The measure not adopted to take care of the embankment failure is __________ |
| A. | Benching |
| B. | Grass turf |
| C. | Stone pitching |
| D. | Rise of embankment above HFL |
| Answer» E. | |
| 3. |
The slopes and edges of road embankment get eroded leading to the formation of __________ |
| A. | Ruts |
| B. | Cuts |
| C. | Pot holes |
| D. | Cracks |
| Answer» B. Cuts | |
| 4. |
The culvert is a structure whose span is less than __________ |
| A. | 15m |
| B. | 60m |
| C. | 7m |
| D. | 6m |
| Answer» E. | |
| 5. |
The longitudinal slope erosion can be corrected by __________ |
| A. | Compaction |
| B. | Consolidated soil |
| C. | Permeability |
| D. | Void ratio |
| Answer» B. Consolidated soil | |
| 6. |
The soil erosion may take place on roadside drains where the longitudinal slope is? |
| A. | Very steep |
| B. | Steep |
| C. | Normal |
| D. | Not steep |
| Answer» C. Normal | |
| 7. |
On roads where the soil has been deposited should be stripped by __________ |
| A. | Trowel |
| B. | Vicat apparatus |
| C. | Blade grader |
| D. | Bulldozer |
| Answer» D. Bulldozer | |
| 8. |
The desired cross slope in embankment is __________ |
| A. | 1% |
| B. | 2% |
| C. | 3% |
| D. | 4% |
| Answer» E. | |
| 9. |
The maintenance of rigid pavement is __________ |
| A. | Easy |
| B. | Difficult |
| C. | Very difficult |
| D. | Neutral |
| Answer» B. Difficult | |
| 10. |
The maintenance works are not possible for __________ |
| A. | Shoulder |
| B. | Pavement |
| C. | Embankment |
| D. | Sub grade |
| Answer» E. | |