This section includes 583 Mcqs, each offering curated multiple-choice questions to sharpen your Mechanical Engineering knowledge and support exam preparation. Choose a topic below to get started.
251. |
Percent idle time for men or machines is found by |
A. | Work sampling |
B. | Time study |
C. | Method study |
D. | Work study |
Answer» B. Time study | |
252. |
Queueing theory is used for |
A. | Inventory problems |
B. | Traffic congestion studies |
C. | Job-shop scheduling |
D. | All of the above |
Answer» E. | |
253. |
Critical Path Net Work helps an engineer |
A. | To concentrate his attention on critical activities |
B. | To divert the resources from noncritical advanced activities to critical activities |
C. | To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project |
D. | All of the above |
Answer» E. | |
254. |
Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time. |
A. | One-fourth |
B. | One-half |
C. | Equal to |
D. | Twice |
Answer» C. Equal to | |
255. |
The product layout |
A. | Lowers overall manufacturing time |
B. | Requires less space for placing machines |
C. | Utilizes machine and labour better |
D. | All of these |
Answer» E. | |
256. |
Travel charts are used to |
A. | Analyze material handling |
B. | Determine inventory control difficulties |
C. | Plan material handling procedure and routes |
D. | All of the above |
Answer» E. | |
257. |
String diagram is used when |
A. | Team of workers is working at a place |
B. | Material handling is to be done |
C. | Idle time is to be reduced |
D. | All of the above |
Answer» B. Material handling is to be done | |
258. |
Which of the following is independent of sales forecast? |
A. | Productivity |
B. | Inventory control |
C. | Production planning |
D. | Production control |
Answer» B. Inventory control | |
259. |
Merit rating is the method of determining the |
A. | Relative values of a job |
B. | Workers performance on a job |
C. | Worth of a machine |
D. | Value of overall production |
Answer» C. Worth of a machine | |
260. |
Job evaluation is the method of determining the |
A. | Relative worth of jobs |
B. | Skills required by a worker |
C. | Contribution of a worker |
D. | Contribution of a job |
Answer» B. Skills required by a worker | |
261. |
The critical path of a network represents |
A. | The minimum time required for completion of project |
B. | The maximum time required for completion of project |
C. | Maximum cost required for completion of project |
D. | Minimum cost required for completion of project |
Answer» B. The maximum time required for completion of project | |
262. |
The main advantage of line organisation is its |
A. | Effective command and control |
B. | Defined responsibilities at all levels |
C. | Rigid discipline in the organisation |
D. | All of the above |
Answer» E. | |
263. |
Work study comprises following main techniques |
A. | Method study and work measurement |
B. | Method study and time study |
C. | Time study and work measurement |
D. | Method study and job evaluation |
Answer» B. Method study and time study | |
264. |
In micro-motion study, therblig is described by |
A. | A symbol |
B. | An event |
C. | An activity |
D. | Standard symbol and colour |
Answer» E. | |
265. |
String diagram is used |
A. | For checking the relative values of various layouts |
B. | When a group of workers are working at a place |
C. | Where processes require the operator to be moved from one place to another |
D. | All of the above |
Answer» E. | |
266. |
Merit Rating is the method of determining worth of |
A. | A job |
B. | An individual employee |
C. | A particular division in workshop |
D. | Machine |
Answer» C. A particular division in workshop | |
267. |
The average time recorded by work study man for an operation is called |
A. | Standard time |
B. | Normal time |
C. | Representative time |
D. | None of these |
Answer» D. None of these | |
268. |
The most important function of inventory control is |
A. | Stock control system |
B. | To run the stores effectively |
C. | Technical responsibility for the state of materials |
D. | All of the above |
Answer» E. | |
269. |
The main object of scientific layout is |
A. | To produce better quality of product |
B. | To utilize maximum floor area |
C. | To minimize production delays |
D. | All of these |
Answer» E. | |
270. |
The aim of value engineering is to |
A. | Find the depreciation value of a machine |
B. | Determine the selling price of a product |
C. | Minimize the cost without change in quality of the product |
D. | All of the above |
Answer» D. All of the above | |
271. |
Pick up the correct statement about relationship between various floats |
A. | Free float = total float |
B. | Independent float = total float |
C. | Independent float > free float |
D. | Independent float < free float |
Answer» E. | |
272. |
Basic motion time study gives times for basic motions in ten thousandths of |
A. | Second |
B. | Minute |
C. | Hour |
D. | Day |
Answer» C. Hour | |
273. |
In the perpetual inventory control, the material is checked when it reaches its |
A. | Minimum value |
B. | Maximum value |
C. | Average value |
D. | Alarming value |
Answer» B. Maximum value | |
274. |
Inventory management consists of |
A. | Effective running of stores |
B. | State of merchandise methods of storing and maintenance etc. |
C. | Stock control system |
D. | All of the above |
Answer» E. | |
275. |
Travel charts provide |
A. | An idea of the flow of materials at various stages |
B. | A compact estimate of the handling which must be done between various work sections |
C. | The information for changes required in rearranging material handling equipment |
D. | An approximate estimate of the handling which must be done at a particular station |
Answer» C. The information for changes required in rearranging material handling equipment | |
276. |
The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store |
A. | Inflated system |
B. | Primary cost method |
C. | Current value method |
D. | Fixed price method |
Answer» B. Primary cost method | |
277. |
A systematic job improvement sequence will consist of |
A. | Motion study |
B. | Time study |
C. | Job enrichment |
D. | All of these |
Answer» E. | |
278. |
The main disadvantage of line organisation is |
A. | Top level executives have to do excessive work |
B. | Structure is rigid |
C. | Communication delays occur |
D. | All of the above |
Answer» E. | |
279. |
In the cost structure of a product, the selling price is determined by the factors such as |
A. | Sales turn over |
B. | Lowest competitive price |
C. | Various elements of the cost |
D. | All of the above |
Answer» E. | |
280. |
Work study is most useful |
A. | Where production activities are involved |
B. | In judging the rating of machines |
C. | In improving industrial relations |
D. | In judging the output of a man and improving it |
Answer» B. In judging the rating of machines | |
281. |
Time study is carried out |
A. | By finding all the significant informations regarding the job, work place and machine tool etc |
B. | By breaking up each operation into small elements which are measurable with the help of the measuring device accurately |
C. | By observing and recording the time taken by the operator for an operation |
D. | All of the above |
Answer» E. | |
282. |
In which of the following layouts, the lines need to the balanced |
A. | Process layout |
B. | Product layout |
C. | Fixed position layout |
D. | Plant layout |
Answer» C. Fixed position layout | |
283. |
Which of the following wage incentive plan is applied to all workers? |
A. | Halsey plan |
B. | Gantt plan |
C. | Emerson's efficiency plan |
D. | Rowan plan |
Answer» B. Gantt plan | |
284. |
Linear programming can be applied successfully to |
A. | Chemical industry |
B. | Oil industry |
C. | Banks |
D. | All of these |
Answer» E. | |
285. |
The work study is done by means of |
A. | Planning chart |
B. | Process chart |
C. | Stop watch |
D. | Any one of these |
Answer» D. Any one of these | |
286. |
In break-even analysis, total cost consists of |
A. | Fixed cost |
B. | Variable cost |
C. | Fixed cost + variable cost |
D. | Fixed cost + variable cost + overheads |
Answer» D. Fixed cost + variable cost + overheads | |
287. |
In break even analysis, total cost consists of |
A. | Fixed cost + sales revenue |
B. | Variable cost + sales revenue |
C. | Fixed cost + variable cost |
D. | Fixed cost + variable cost + profit |
Answer» D. Fixed cost + variable cost + profit | |
288. |
Inventory control in production, planning and control aims at |
A. | Achieving optimization |
B. | Ensuring against market fluctuations |
C. | Acceptable customer service at low capital investment in inventory |
D. | Discounts allowed in bulk purchase |
Answer» D. Discounts allowed in bulk purchase | |
289. |
CPM stands for |
A. | Combined Process Method |
B. | Critical Path Method |
C. | Common Planning Method |
D. | Critical Process Method |
Answer» C. Common Planning Method | |
290. |
CPM requires |
A. | Single time estimate |
B. | Double time estimate |
C. | Triple time estimate |
D. | None of these |
Answer» B. Double time estimate | |
291. |
CPM is the |
A. | Time oriented technique |
B. | Event oriented technique |
C. | Activity oriented technique |
D. | Target oriented technique |
Answer» D. Target oriented technique | |
292. |
The objective of time study is to determine the time required to complete a job by |
A. | Fast worker |
B. | Average worker |
C. | Slow worker |
D. | New entrant |
Answer» C. Slow worker | |
293. |
Routing assists engineers in deciding in advance |
A. | The flow of material in the plant |
B. | The methods of proper utilization of manpower |
C. | The methods of proper utilization of machines |
D. | The layout of factory facilities |
Answer» D. The layout of factory facilities | |
294. |
Gantt chart is used for |
A. | Inventory control |
B. | Material handling |
C. | Production schedule |
D. | Machine repair schedules |
Answer» D. Machine repair schedules | |
295. |
The technique of value analysis can be applied to |
A. | Complicated items only |
B. | Simple items only |
C. | Crash programmer items only |
D. | Any item |
Answer» E. | |
296. |
At the break-even point, |
A. | Total cost is more than the sales revenue |
B. | Total cost is less than the sales revenue |
C. | Total cost is equal to sales revenue |
D. | Fixed cost is equal to variable cost |
Answer» D. Fixed cost is equal to variable cost | |
297. |
The type of organisation preferred for an automobile industry, is |
A. | Line organisation |
B. | Functional organisation |
C. | Line and staff organisation |
D. | Line, staff and functional organisation |
Answer» D. Line, staff and functional organisation | |
298. |
The process layout is best suited where |
A. | Specialization exists |
B. | Machines are arranged according to sequence of operation |
C. | Few number of non-standardized units is to be produced |
D. | Mass production is envisaged |
Answer» D. Mass production is envisaged | |
299. |
The unit cost in case of batch production is __________as compared to jobbing production. |
A. | Same |
B. | Low |
C. | High |
D. | None of these |
Answer» C. High | |
300. |
Product layout is used for |
A. | Job production |
B. | Batch production |
C. | Mass production |
D. | Any one of these |
Answer» D. Any one of these | |