251.

Percent idle time for men or machines is found by

A. Work sampling
B. Time study
C. Method study
D. Work study
Answer» B. Time study
252.

Queueing theory is used for

A. Inventory problems
B. Traffic congestion studies
C. Job-shop scheduling
D. All of the above
Answer» E.
253.

Critical Path Net Work helps an engineer

A. To concentrate his attention on critical activities
B. To divert the resources from noncritical advanced activities to critical activities
C. To be cautious for avoiding any delay in the critical activities to avoid delay of the whole project
D. All of the above
Answer» E.
254.

Both Rowan plan and 50-50 Halsey plan will provide the same earning when the actual time is _________ the standard time.

A. One-fourth
B. One-half
C. Equal to
D. Twice
Answer» C. Equal to
255.

The product layout

A. Lowers overall manufacturing time
B. Requires less space for placing machines
C. Utilizes machine and labour better
D. All of these
Answer» E.
256.

Travel charts are used to

A. Analyze material handling
B. Determine inventory control difficulties
C. Plan material handling procedure and routes
D. All of the above
Answer» E.
257.

String diagram is used when

A. Team of workers is working at a place
B. Material handling is to be done
C. Idle time is to be reduced
D. All of the above
Answer» B. Material handling is to be done
258.

Which of the following is independent of sales forecast?

A. Productivity
B. Inventory control
C. Production planning
D. Production control
Answer» B. Inventory control
259.

Merit rating is the method of determining the

A. Relative values of a job
B. Workers performance on a job
C. Worth of a machine
D. Value of overall production
Answer» C. Worth of a machine
260.

Job evaluation is the method of determining the

A. Relative worth of jobs
B. Skills required by a worker
C. Contribution of a worker
D. Contribution of a job
Answer» B. Skills required by a worker
261.

The critical path of a network represents

A. The minimum time required for completion of project
B. The maximum time required for completion of project
C. Maximum cost required for completion of project
D. Minimum cost required for completion of project
Answer» B. The maximum time required for completion of project
262.

The main advantage of line organisation is its

A. Effective command and control
B. Defined responsibilities at all levels
C. Rigid discipline in the organisation
D. All of the above
Answer» E.
263.

Work study comprises following main techniques

A. Method study and work measurement
B. Method study and time study
C. Time study and work measurement
D. Method study and job evaluation
Answer» B. Method study and time study
264.

In micro-motion study, therblig is described by

A. A symbol
B. An event
C. An activity
D. Standard symbol and colour
Answer» E.
265.

String diagram is used

A. For checking the relative values of various layouts
B. When a group of workers are working at a place
C. Where processes require the operator to be moved from one place to another
D. All of the above
Answer» E.
266.

Merit Rating is the method of determining worth of

A. A job
B. An individual employee
C. A particular division in workshop
D. Machine
Answer» C. A particular division in workshop
267.

The average time recorded by work study man for an operation is called

A. Standard time
B. Normal time
C. Representative time
D. None of these
Answer» D. None of these
268.

The most important function of inventory control is

A. Stock control system
B. To run the stores effectively
C. Technical responsibility for the state of materials
D. All of the above
Answer» E.
269.

The main object of scientific layout is

A. To produce better quality of product
B. To utilize maximum floor area
C. To minimize production delays
D. All of these
Answer» E.
270.

The aim of value engineering is to

A. Find the depreciation value of a machine
B. Determine the selling price of a product
C. Minimize the cost without change in quality of the product
D. All of the above
Answer» D. All of the above
271.

Pick up the correct statement about relationship between various floats

A. Free float = total float
B. Independent float = total float
C. Independent float > free float
D. Independent float < free float
Answer» E.
272.

Basic motion time study gives times for basic motions in ten thousandths of

A. Second
B. Minute
C. Hour
D. Day
Answer» C. Hour
273.

In the perpetual inventory control, the material is checked when it reaches its

A. Minimum value
B. Maximum value
C. Average value
D. Alarming value
Answer» B. Maximum value
274.

Inventory management consists of

A. Effective running of stores
B. State of merchandise methods of storing and maintenance etc.
C. Stock control system
D. All of the above
Answer» E.
275.

Travel charts provide

A. An idea of the flow of materials at various stages
B. A compact estimate of the handling which must be done between various work sections
C. The information for changes required in rearranging material handling equipment
D. An approximate estimate of the handling which must be done at a particular station
Answer» C. The information for changes required in rearranging material handling equipment
276.

The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store

A. Inflated system
B. Primary cost method
C. Current value method
D. Fixed price method
Answer» B. Primary cost method
277.

A systematic job improvement sequence will consist of

A. Motion study
B. Time study
C. Job enrichment
D. All of these
Answer» E.
278.

The main disadvantage of line organisation is

A. Top level executives have to do excessive work
B. Structure is rigid
C. Communication delays occur
D. All of the above
Answer» E.
279.

In the cost structure of a product, the selling price is determined by the factors such as

A. Sales turn over
B. Lowest competitive price
C. Various elements of the cost
D. All of the above
Answer» E.
280.

Work study is most useful

A. Where production activities are involved
B. In judging the rating of machines
C. In improving industrial relations
D. In judging the output of a man and improving it
Answer» B. In judging the rating of machines
281.

Time study is carried out

A. By finding all the significant informations regarding the job, work place and machine tool etc
B. By breaking up each operation into small elements which are measurable with the help of the measuring device accurately
C. By observing and recording the time taken by the operator for an operation
D. All of the above
Answer» E.
282.

In which of the following layouts, the lines need to the balanced

A. Process layout
B. Product layout
C. Fixed position layout
D. Plant layout
Answer» C. Fixed position layout
283.

Which of the following wage incentive plan is applied to all workers?

A. Halsey plan
B. Gantt plan
C. Emerson's efficiency plan
D. Rowan plan
Answer» B. Gantt plan
284.

Linear programming can be applied successfully to

A. Chemical industry
B. Oil industry
C. Banks
D. All of these
Answer» E.
285.

The work study is done by means of

A. Planning chart
B. Process chart
C. Stop watch
D. Any one of these
Answer» D. Any one of these
286.

In break-even analysis, total cost consists of

A. Fixed cost
B. Variable cost
C. Fixed cost + variable cost
D. Fixed cost + variable cost + overheads
Answer» D. Fixed cost + variable cost + overheads
287.

In break even analysis, total cost consists of

A. Fixed cost + sales revenue
B. Variable cost + sales revenue
C. Fixed cost + variable cost
D. Fixed cost + variable cost + profit
Answer» D. Fixed cost + variable cost + profit
288.

Inventory control in production, planning and control aims at

A. Achieving optimization
B. Ensuring against market fluctuations
C. Acceptable customer service at low capital investment in inventory
D. Discounts allowed in bulk purchase
Answer» D. Discounts allowed in bulk purchase
289.

CPM stands for

A. Combined Process Method
B. Critical Path Method
C. Common Planning Method
D. Critical Process Method
Answer» C. Common Planning Method
290.

CPM requires

A. Single time estimate
B. Double time estimate
C. Triple time estimate
D. None of these
Answer» B. Double time estimate
291.

CPM is the

A. Time oriented technique
B. Event oriented technique
C. Activity oriented technique
D. Target oriented technique
Answer» D. Target oriented technique
292.

The objective of time study is to determine the time required to complete a job by

A. Fast worker
B. Average worker
C. Slow worker
D. New entrant
Answer» C. Slow worker
293.

Routing assists engineers in deciding in advance

A. The flow of material in the plant
B. The methods of proper utilization of manpower
C. The methods of proper utilization of machines
D. The layout of factory facilities
Answer» D. The layout of factory facilities
294.

Gantt chart is used for

A. Inventory control
B. Material handling
C. Production schedule
D. Machine repair schedules
Answer» D. Machine repair schedules
295.

The technique of value analysis can be applied to

A. Complicated items only
B. Simple items only
C. Crash programmer items only
D. Any item
Answer» E.
296.

At the break-even point,

A. Total cost is more than the sales revenue
B. Total cost is less than the sales revenue
C. Total cost is equal to sales revenue
D. Fixed cost is equal to variable cost
Answer» D. Fixed cost is equal to variable cost
297.

The type of organisation preferred for an automobile industry, is

A. Line organisation
B. Functional organisation
C. Line and staff organisation
D. Line, staff and functional organisation
Answer» D. Line, staff and functional organisation
298.

The process layout is best suited where

A. Specialization exists
B. Machines are arranged according to sequence of operation
C. Few number of non-standardized units is to be produced
D. Mass production is envisaged
Answer» D. Mass production is envisaged
299.

The unit cost in case of batch production is __________as compared to jobbing production.

A. Same
B. Low
C. High
D. None of these
Answer» C. High
300.

Product layout is used for

A. Job production
B. Batch production
C. Mass production
D. Any one of these
Answer» D. Any one of these