

MCQOPTIONS
Saved Bookmarks
This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Pavement Design knowledge and support exam preparation. Choose a topic below to get started.
1. |
Which code is used for guidelines on the rehabilitation of rigid pavements? |
A. | IRC 83:2012 |
B. | IRC 83:2008 |
C. | IRC SP 83:2008 |
D. | IRC SP 83:2012 |
Answer» D. IRC SP 83:2012 | |
2. |
In CPCD pavements, the joint repair can be done by ______ |
A. | FDR |
B. | HDR |
C. | FDR and HDR |
D. | Retrofitting |
Answer» D. Retrofitting | |
3. |
Which method cannot be used in CRCP type rigid pavement? |
A. | Dowel bar retrofitting |
B. | Stitching |
C. | Bonded concrete overlay |
D. | Diamond grinding |
Answer» B. Stitching | |
4. |
The performance of an unbonded concrete overlay depends on the thickness and quality of ______ |
A. | Existing surface |
B. | Interlayer |
C. | Subgrade |
D. | Base course |
Answer» C. Subgrade | |
5. |
The method of diamond grinding reduces the thickness of the pavement and might prove to be a reason for the reduced load-carrying capacity. |
A. | True |
B. | False |
Answer» C. | |
6. |
HMA overlays in the CRCP pavements have been successful in the treatment of ______ |
A. | Pumping |
B. | Punchouts |
C. | Corner cracks |
D. | Spalling |
Answer» C. Corner cracks | |
7. |
Which of the below defects cannot be rectified by using the diamond grinding method? |
A. | Bumps |
B. | Skidding |
C. | Sags |
D. | Noise |
Answer» D. Noise | |
8. |
Which rehabilitation method is effective when the faulting is severe? |
A. | Dowel bar retrofitting |
B. | Transverse joint fixing |
C. | Tie bar retrofitting |
D. | Longitudinal joint fixing |
Answer» B. Transverse joint fixing | |
9. |
Which of the below is not a type of stitching used in the rigid pavement? |
A. | Slot stitching |
B. | V-bar stitching |
C. | Cross stitching |
D. | U-bar stitching |
Answer» C. Cross stitching | |
10. |
In CPCD pavements, the stitching method is most useful for transverse cracks. |
A. | True |
B. | False |
Answer» C. | |
11. |
Shotblasting is a method used to ______ the surface of the rigid pavement. |
A. | Scarify |
B. | Crush |
C. | Remove |
D. | Compact |
Answer» B. Crush | |
12. |
A CC pavement has sufficient structural strength and no significant distress. But it has insufficient thickness. What rehabilitation strategy is to be used in this case? |
A. | Bonded asphalt overlay |
B. | Hot mix asphalt overlay |
C. | Bonded concrete overlay |
D. | Cold mix asphalt overlay |
Answer» D. Cold mix asphalt overlay | |
13. |
How is the delamination in the rigid pavement identified to conduct repair works? |
A. | Sound test |
B. | Lab testing |
C. | Profile checking |
D. | Destructive testing |
Answer» B. Lab testing | |
14. |
______ is done after identifying the repair limits in the FDR method. |
A. | Removal of slab |
B. | Drill holes |
C. | Saw-cut the perimeter |
D. | Removal of the damaged base |
Answer» D. Removal of the damaged base | |
15. |
Which of the below failures in rigid pavement does not require a full-depth repair? |
A. | Transverse cracks |
B. | Shattered slabs |
C. | Corner breaks |
D. | Shrinkage cracks |
Answer» E. | |