

MCQOPTIONS
Saved Bookmarks
1. |
______ is done after identifying the repair limits in the FDR method. |
A. | Removal of slab |
B. | Drill holes |
C. | Saw-cut the perimeter |
D. | Removal of the damaged base |
Answer» D. Removal of the damaged base | |