MCQOPTIONS
Saved Bookmarks
This section includes 11 Mcqs, each offering curated multiple-choice questions to sharpen your Total Quality Management knowledge and support exam preparation. Choose a topic below to get started.
1. |
According to common industry scale, what does detection ranking (D) 1 indicate? |
A. | Can t be determined |
B. | Uncertainty in detection |
C. | The value doesn t exist |
D. | Certainly detectable |
Answer» E. | |
2. |
According to common industry scale, what does occurrence ranking (O) 1 indicate? |
A. | Not likely |
B. | Highly likely |
C. | Certain to happen |
D. | The value doesn t exist |
Answer» B. Highly likely | |
3. |
According to common industry scale, what does severity ranking (S) 1 indicate? |
A. | Very serious effect |
B. | No effect |
C. | Sometimes serious effect |
D. | The value doesn t exist |
Answer» C. Sometimes serious effect | |
4. |
A particular product has been given the following rankings for calculating RPN while preparing FMEA chart, S=10, O=2, D=2. What is the value of RPN? |
A. | 20 |
B. | 10 |
C. | 40 |
D. | 2 |
Answer» D. 2 | |
5. |
Which of the following is not a benefit of FMEA? |
A. | Increase in customer satisfaction |
B. | Prioritize product/process deficiencies |
C. | Maximize late changes and associated cost |
D. | Document and track actions taken to reduce risk |
Answer» D. Document and track actions taken to reduce risk | |
6. |
Find the odd one out related to the data inputs required to prepare FMEA. |
A. | Product and process specifications |
B. | Reliability data |
C. | Customer priority data |
D. | Quality engineer |
Answer» E. | |
7. |
Find the odd one out related to the FMEA team. |
A. | Assembly engineer |
B. | Manufacturing engineer |
C. | Quality engineer |
D. | Process variability data |
Answer» E. | |
8. |
The analysis of potential failures of product or service due to component or subsystem unreliability is involved in design FMEA. |
A. | True |
B. | False |
Answer» B. False | |
9. |
What is RPN? |
A. | Risk Potential Number |
B. | Risk Priority Number |
C. | Risk Preference number |
D. | Risk Preventive Number |
Answer» C. Risk Preference number | |
10. |
To anticipate failures and prevent them from happening is the objective of FMEA. |
A. | True |
B. | False |
Answer» B. False | |
11. |
What does FMEA stand for? |
A. | Failure Modes and Effects Analysis |
B. | Failure Modes and Effective Analysis |
C. | Failure Modes and Affective Analysis |
D. | Failure Modes and Efficient Analysis |
Answer» B. Failure Modes and Effective Analysis | |